Laserfiche WebLink
be used to connect the on-site electrical substation into the PG&E grid <br /> distribution system. All facility electrical demands can be accommodated <br /> by PG&E (Koop 1988) . <br /> Propane gas and fuel for the on-site laboratory would be trucked to <br /> the proposed facility. The laboratory fuel gas would be delivered in <br /> small hand-carried pressure vessels and connected to the appropriate <br /> hookups or stored in a secured location within the laboratory. <br /> Mitigation Measure. Prior to any construction, the applicant would <br /> be required to submit formal plans to the marketing department of PG&E. <br /> Grading plans would also have to be submitted. The review process may <br /> take several months. <br /> 3-21 <br /> 104-6.R3 4/10/89 <br />