Laserfiche WebLink
TABLE 3.4 <br /> PROJECT TRIP GENERATION BY COMPONENT <br /> Daily PM Peak Hour <br /> 2-way trips In Out <br /> Employees (1 per car) 56 8 13 <br /> (Assuming no <br /> in/outs for food) <br /> Biomass Delivery Trucks 120 5 5 <br /> Lubricant Delivery Trucks 8 1 1 <br /> Briquette Delivery Trucks 96 4 4 <br /> Distillate Delivery Trucks 2(a) 0 1(a) <br /> 18 24 <br /> TOTAL PROJECT TRIP GENERATION SUMMARY <br /> Daily PM Peak Hour <br /> 2-way trips In Out <br /> Employees 56 8 13 <br /> Trucks 226 10 1-1 <br /> 282 18 24 <br /> (a) Twice per week only <br /> Source: Falcon Energy; Holland, 1987. <br /> 3-29 <br /> 101-32.R3 4/10/89 <br />