My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HAMMER
>
3555
>
2300 - Underground Storage Tank Program
>
PR0231130
>
COMPLIANCE INFO_2001-2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/15/2023 10:28:12 AM
Creation date
4/27/2020 12:23:29 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2008
RECORD_ID
PR0231130
PE
2361
FACILITY_ID
FA0002232
FACILITY_NAME
QUIK STOP MARKET #3132*
STREET_NUMBER
3555
Direction
W
STREET_NAME
HAMMER
STREET_TYPE
LN
City
STOCKTON
Zip
95209
APN
071-180-20
CURRENT_STATUS
01
SITE_LOCATION
3555 W HAMMER LN
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231130_3555 W HAMMER_2001-2008.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />SECONDARY LINE TESTING <br />Test Method By: <br />Test Method Uses: <br />Measuring Equipment Used: <br />Manufacturer <br />• Pressure <br />Pressure Gauge <br />• industry Standard <br />Vacuum <br />(range 0 to 10 psig) <br />Professional Engr. Other (see below) <br />Hydrostatic Other (see below) <br />Description <br />Line #1 <br />Line #2 <br />Line #3 <br />5 <br />Pipe manufacturer <br />Ameron <br />Ameron <br />Ameron <br />1:03 PM <br />1:07 PM <br />Pipe material <br />FRP <br />FRP <br />FRP <br />Test duration (hrmin) <br />1:00 <br />Primary pipe diameter (inches) <br />2" <br />2" <br />2" <br />0 <br />0 <br />Secondary pipe diameter (inches) <br />3" <br />3" <br />3" <br />runs <br />PASS <br />Tank product <br />Gasoline - 87 <br />Gasoline - 89 <br />Gasoline - 91 <br />Method of secondary pipe is <br />isolation <br />Clamshell /Boot <br />CNashell /Boot <br />m <br />Clamshell J Boot <br />Location of secondary pipe isolation <br />Sump/UDC <br />Sump /UDC <br />Sump /UDC <br />Estimated length of piping run (feet) <br />105 <br />95 <br />105' <br />(i ude length of branch <br />Wait time for pressure to stabilize (hr:min) <br />Comments: <br />0:06 <br />0:03 <br />0:04 <br />Test start time <br />12:00 PM <br />12:03 PM <br />12:07 PM <br />Initial pressure (psg) <br />5 <br />5 <br />5 <br />Test end time <br />1:00 PM <br />1:03 PM <br />1:07 PM <br />Final pressure <br />5 <br />5 <br />5 <br />Test duration (hrmin) <br />1:00 <br />1:00 <br />1:00 <br />Change in pressure (prig) <br />0 <br />0 <br />0 <br />PassJFail threshold (prig) <br />0.5 <br />0.5 <br />0.5 <br />runs <br />PASS <br />PASS <br />PASS <br />Wait time for pressure to stabilize (hr:min) <br />Comments: <br />0:06 <br />0:03 <br />0:04 <br />Test start time <br />12:00 PM <br />12:03 PM <br />12:07 PM <br />Initial pressure (psg) <br />5 <br />5 <br />5 <br />Test end time <br />1:00 PM <br />1:03 PM <br />1:07 PM <br />Final pressure <br />5 <br />5 <br />5 <br />Test duration (hrmin) <br />1:00 <br />1:00 <br />1:00 <br />Change in pressure (prig) <br />0 <br />0 <br />0 <br />PassJFail threshold (prig) <br />0.5 <br />0.5 <br />0.5 <br />TEST RESULT <br />PASS <br />PASS <br />PASS <br />0 2003 Walton Engineering, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.