My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SCHULTE
>
16900
>
2200 - Hazardous Waste Program
>
PR0507054
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2020 1:27:55 PM
Creation date
4/27/2020 12:24:09 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0507054
PE
2229
FACILITY_ID
FA0007697
FACILITY_NAME
SAFEWAY DISTRIBUTION CENTER
STREET_NUMBER
16900
Direction
W
STREET_NAME
SCHULTE
STREET_TYPE
RD
City
TRACY
Zip
95377
APN
20943001
CURRENT_STATUS
01
SITE_LOCATION
16900 W SCHULTE RD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2229_PR0507054_16900 W SCHULTE_.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
470
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. . 3.3.1 Responsibilities o ployees <br />Emergency Coordinator (or next alternate available): <br />1. As soon as the EC is notified of an emergency due to the earthquake, he/she is to <br />begin following the ECS procedures. He/she will be informed by the Supervisor(s) <br />of the location, meteorological conditions, extent of damage, etc. <br />2. With all of the information on the location of damage and extent of the emergency, <br />he/she must decide the following: <br />a. Is evacuation necessary for parts or all of the plant? <br />b. If evacuation is necessary, which route to the Evacuation Assembly Area <br />will be used for the facility? <br />0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.