Laserfiche WebLink
ARB Approved IOM—Healy Phase II EV ystem—VR-201-A(Br`eakaway—8701 W) Page 27 <br /> Healy Model 8701W Breakaway <br /> HEALY STAGE II VAPOR (ROBEDISPOA <br /> RECOVERY END <br /> PART NO.6701W BREAKAWAY(HOSE B (HOSE ADAA PTOR) <br /> ASSEMBLY&INSTALLATION INSTRIUCTIONS �R <br /> S <br /> ® The Healy Breakaway is delivered loosely assembled.Handle 0—rings 4 <br /> carefully to avoid dropping and/or losing the precision parts. lnetall as <br /> shown <br /> ■ Failure to remove the Shear screw(Iters 1)as described in <br /> Step 1 below could result In fracturing or shearing of the screw <br /> The Shear screw will require replacement if damaged. <br /> ■ Be sure to assemble parts in the exact sequence as shown below. <br /> ■ Be sure to lubricate all*—rings and quad scale where indicated. <br /> Use of ordinary motor oil is sufficient. PIGTAIL <br /> IS Do not use threod—sealing compounds on straight threads. <br /> ASSEMBLY INSTRUCTIONS 4 <br /> (refer to diagram at right) <br /> STRAIGHT <br /> 1.Remove the Shear Screw(Item 1)and the packing materials. THREAD <br /> Separate the halves of the breakaway assembly,retaining the 6 <br /> loose internal valves,(Items 2&3)and the spring(Item 13) <br /> inside the upper half. $ <br /> 2.Select the pigtail, (whip hose)assembly.Lubricate the quad 13 <br /> and o—ring seals(Items 4,5,8,&straight thread, Item 6). <br /> Assemble the pigtail to the input half of the Breakoway(Item 7) 14 <br /> being sure that the larger and of the conical spring is centered quad rings <br /> in the groove on the white valve.Tighten hose to Breakaway at install as2 <br /> 35 foot pounds.Be sure the vapor tube fitting slides easily into shown <br /> Item 2 before final tightening. It <br /> 3.Select the delivery hose,lubricate the o—ring (Item 4),the quad 7 <br /> seal(Item 5)and straight thread(item 6).Assemble the and with <br /> the quad seal to the output half of the Breakaway(Item 10). BREAKAWAY <br /> install the secondary hose and tighten to 35 foot pounds.Be sere 12 <br /> the vapor tube fitting slides easily into item 3 before final tightening. , ALIGNMENT <br /> PIN <br /> 4.Carefully fit both halves of the Breakaway together.Utiizing _ <br /> the allgnment pin, fully compress both halves and insert the — 1 <br /> Shear Screw(item 1)and hand tighten.Final tighten to 20 , SPAR <br /> inch pounds. Tools should not be necessary to initially start .,�. <br /> the screws. 10 <br /> 11 <br /> 14 2 1-117 6412A PRECISON®87U 7W 3 <br /> 13 1 ASM-sib WM%0130I113AL 14 <br /> 12 1 1-122 0-ma 709 <br /> 11 2 75-314 _ 3 <br /> 1 _ carr NOME END Quad rings <br /> 2 1-m4P install as 6 <br /> 7 1 =M-745 BODY.DISPENSM END 748 shown <br /> 8 2 HOSE PIT18N8 <br /> a 4/ ass o-Rs,D 1 W2 QUAD-111010 5140J#W47moz 4 <br /> HOSE <br /> 3 esrm-781 vALAG.NOME END 781 <br /> 2 1 iRlel-748 M%LVL N END 70 <br /> 1 2 MMM-715 990.SLA. 761F <br /> 7EH N& ON on No. P/N � <br /> LIST OF NAIERIK <br /> PRODUCT-TO NOZZLE-END <br /> Healy Systems, Inc. Website: http://www.healysystems.com <br /> 18 Hampshire Drive Email: sales@healysystems.com <br /> Hudson, New Hampshire 03051 USA Telephone: 603.882.2472 <br /> ARB Approved Installation, Operation and Maintenance Manual (April 8, 2005) Fax: 603.882.5189 <br /> Healy Systems, Inc. —the innovative leader in Stage 11 vapor recovery equipment <br />