My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0005807
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
935
>
3500 - Local Oversight Program
>
PR0545617
>
ARCHIVED REPORTS_XR0005807
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/28/2020 1:59:09 PM
Creation date
4/28/2020 1:13:14 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0005807
RECORD_ID
PR0545617
PE
3528
FACILITY_ID
FA0005557
FACILITY_NAME
RIPON FARM SERVICE
STREET_NUMBER
935
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102007/2011
CURRENT_STATUS
02
SITE_LOCATION
935 FRONTAGE RD
P_LOCATION
05
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
50
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 20 January 2000 <br /> AGE-NC Project No 95-0173 <br /> Page 6 of 14 <br /> 3.0. SCOPE OF WORK <br /> Based upon the results in the Corrective Action Plan dated 01 June 1999, the PHS-EHD is requiring <br /> ground water and soil remediation of petroleum hydrocarbon impacted area at the site <br /> Remediation within the petroleum hydrocarbon impacted area at the site will consist of the following <br /> tasks <br /> • Permitting, planning and pre-field work activities, <br /> • Installation of remediation wells, <br /> • Installation of underground remediation piping system, <br /> • Soil vapor extraction system start-up period, <br /> • Monitoring and maintenance, <br /> • Progress/confirmation sampling <br /> Each of these tasks are discussed below in detail <br /> 3 1 PERMITTING, PLANNING AND PRE-FIELD WORK ACTIVITIES <br /> Applicable and necessary permits will be obtained from the PHS-EHD, San Joaquin Valley Air, <br /> Pollution Control District(SJVAPCD) and City of Ripon Building Department prior to initiation of <br /> the remediation project As required by PHS-EHD permitting, a health and safety plan will be <br /> prepared in accordance with Occupational Safety and Health Guidance Manual for Hazardous <br /> Waste Site Activities (National Institute for Occupational Safety and Health Administration, U S <br /> Coast Guard and U S Environmental Protection Agency, 1985) Prior to digging activities, each <br /> proposed digging location will be clearly marked and an utility clearance obtained through <br /> Underground Service Alert <br /> 32 INSTALLATION OF REMEDIATION WELLS <br /> An SVE system in conjunction with an IAS system is proposed to reduce petroleum hydrocarbon <br /> mass from the petroleum hydrocarbon-impacted area at the site In order to maximize the efficiency <br /> of the clean-up efforts, a 24-hour operation of the system is planned A typical destruction rate of <br /> greater than 95% of hydrocarbon vapors is expected throughout the entire cleanup duration <br /> Advanced GeoEnvironmental,Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.