My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FRONTAGE
>
932
>
2900 - Site Mitigation Program
>
PR0524571
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/1/2020 2:35:36 PM
Creation date
5/1/2020 2:15:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0524571
PE
2960
FACILITY_ID
FA0016482
FACILITY_NAME
RIPON FARM SERVICE
STREET_NUMBER
932
Direction
S
STREET_NAME
FRONTAGE
STREET_TYPE
RD
City
RIPON
Zip
95366
APN
26102007/11
CURRENT_STATUS
01
SITE_LOCATION
932 S FRONTAGE RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\sballwahn
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
198
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Vicki McCartney [EH] <br /> From: Amy Terrell [aterrell@waterboards.ca.gov] <br /> Sent: Friday, December 21, 2007 1:03 PM <br /> To: SGuthmiller@herumcrabtree.com <br /> Cc: jhawkins@isolalaw.com; bdenouden@riponfarmservice.com; Vicki McCartney[EH]; <br /> rgailey@thesourcegroup.net <br /> Subject: City of Ripon MWs at Ripon Farm Service <br /> Ms. Guthmiller, <br /> Thank you for providing a copy of the 5 December 2007 Well Installation Scope of Work <br /> prepared by the Source Group Inc. The Well Installation Scope of Work ultimately proposes <br /> five shallow monitoring wells and two deep monitoring wells located roughly between Ripon <br /> Farm Service's facility at 938 Frontage Road and City Well No. 12. As of todays date, 21 <br /> December 2007, three shallow wells are proposed on the Ripon Farm Service's facility. The <br /> location of the remaining wells will be identified at a future date as access agreements <br /> are secured. <br /> With this email transmittal, Regional Water Quality Control Board staff conditionally <br /> concur with the portion of the Well Installation Scope of Work proposing installation of <br /> the three shallow monitoring wells to a depth of about 40 feet below ground surface at the <br /> Ripon Farm Service facility. <br /> The conditions are as follows: <br /> Access agreements must be secured before monitoring wells are installed. To date, access <br /> agreements have been secured for two of the three on-site wells. <br /> Installation and construction details shall be subject to the approval of San Joaquin <br /> County Environmental Health Department. <br /> Please provide a copy of the installation report and monitoring reports to Regional Water <br /> Quality Control Board staff, and keep staff apprised of developments regarding the <br /> remaining portion of the Well Installation Scope of Work. <br /> If you have any questions, you may contact me at (916) 464-4680. <br /> Amy Terrell <br /> Regional Water Quality Control Board <br /> Central Valley Region <br /> 11020 Sun Center Drive Suite 200 <br /> Rancho Cordova, CA 95670-6114 <br /> (916) 464-4680 <br /> aterrell@waterboards.ca.gov <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.