Laserfiche WebLink
GE <br /> GENESIS ENGINEERING& REDEVELOPMENT <br /> River is located approximately 1.75 miles southeast of the Site and flows in a southwesterly <br /> direction. <br /> The Site is located near the center of the Central Valley Geomorphic Province, an <br /> asymmetric synclinal trough characterized by extremely thick alluvial deposits on the <br /> western side of the axis. Surficial soils are the result of continental alluvial deposition in the <br /> flood plains of the San Joaquin and Stanislaus Rivers, and because of the structural down- <br /> warping, the overall alluvial section is up to 25,000 feet in the vicinity. The valley extends <br /> for 400 miles with a northwesterly trend and is about 50 miles wide at the latitude of Ripon. <br /> The near-surface soil profile is characterized by unconsolidated silty and clayey soils with <br /> irregular lenses of sand and gravel,typical of overbank fluvial deposition occurring during <br /> the Holocene Epoch. <br /> 2.0 SITE CHARACTERIZATION SCOPE OF WORK <br /> The Work Plan is comprised of the following tasks: <br /> Task 1 —Pre-Field Activities <br /> Task 2—Vertical and Lateral Nitrate Profile <br /> Task 3 —Shallow Water Bearing Unit Aquifer Test Well <br /> Task 4—Aquifer Test <br /> Task 5—Isotope Analyses <br /> Task 6—Data Analysis and Reporting <br /> The Work Plan incorporates the following documents,which are included as Appendices: <br /> 1. Sampling and Analysis Plan ("SAP")—Appendix A <br /> 2. Quality Assurance Project Plan ("QAPP")—Appendix B <br /> 3. Health and Safety Plan ("HASP")—Appendix C <br /> 4. Aquifer Test Procedures—Appendix D <br /> 2.1 Task 1 —Pre-field activities <br /> Pre-field activities will include: <br /> 1. Obtaining access agreements from property owners for the proposed exploratory <br /> boring locations and obtain encroachment permits from the City of Ripon, as <br /> needed—the exact locations of the proposed borings may be adjusted based on field <br /> constraints,permitting issues, access agreements, utility locations, and subsurface <br /> obstructions; <br /> Ripon Farn Services 2 of 7 <br /> Site Characterization Work Plan—Phase II <br /> July 2009 <br />