ti <br /> F. Well development shall continue until a 1 ppm soil sediment content is achieved <br /> or until ordered to stop by the Engineer. <br /> G. At the completion of well development, the Contractor shall measure the depth <br /> to the top of the sand pack to ensure that no slippage has occurred. If the top of <br /> the sand pack is not at the design depth, then the Contractor shall install <br /> additional sand to bring the top of the sand pack to the design depth. <br /> 3.5 SURFACE-C MPLETION <br /> A. Verify excavation for vault is correct. Level and compact subgrade beneath vault <br /> to 90% relative density by ASTM D 1557. <br /> B. Coordinate placement of inlet pipe required by other sections. <br /> C. Place vault such that top of vault lid extends approximately 1 inch above rough <br /> grade. <br /> D. Survey top of vault wall. Walls shall be level, with no more than 0.25 inch <br /> difference between any comers. <br /> E. Set vault lids in-place with concrete as indicated. <br /> F. The Engineer will inspect vault installations. Contractor will be responsible for <br /> any modifications to vault installations requested by the Engineer. <br /> G. Install well-head assembly as specified in Section 15060 and as indicated. <br /> L 3.6 CONTAINMENT AND DISPOSAL OF DRILLING SPOILS AND DRILLING FLUIDS <br /> A. All drilling equipment and tanks or bins used for containment of fluids and <br /> solids generated during drilling activities must be decontaminated prior to E <br /> arrival at the Site. The Engineer will inspect all equipment prior to the start of <br /> drilling operations. <br /> prior to <br /> down-hole The driller shall steam clean all equipment used dop <br /> commencement of drilling and shall containerize all decontamination water. j <br /> 1 <br /> B. Solids Containment Driller shall containerize all drill cuttings in 55 gallon <br /> drums or other suitable container approved by Engineer. After completion of <br /> drilling activities and prior to demobilization from the Sibe, the Contractor shall <br /> characterize and appropriately dispose of drill cuttings as specified herein. ' <br /> C. Fluids Containment The Contractor shall containerize all fluids generated t <br /> during well installation activities and development- These fluids include,but are <br /> not limited to: well development, and equipment washing decontamination <br /> procedures. The fluids shall be stored in a water tight container or tank with lid. <br /> Separate containers will not be required for each dual phase extraction well. <br /> After completion of wel insta ation and development activities,and prior to <br /> demobilization from the Site, the Contractor shall characterize and appropriately <br /> dispose of drilling fluids as specified herein. <br /> 02671-1 ERM 10/98 <br /> 4 <br />