Laserfiche WebLink
PC: 9-6-9u <br /> QX-90-1 <br /> the Planning Division prior to the anniversary date of <br /> the project ' s effective date. <br /> Ordinance Requirements : <br /> The Ordinance Requirements listed below have been identified <br /> as pertinent to this project. Other Ordinance Requirements <br /> may also apply. Ordinance Requirements are not appealable. <br /> 1 . Temporary revegetation shall be planted in areas where <br /> aggregate extraction is complete, with the exception of <br /> the area of active excavation. A Revegetation Plan, <br /> prepared by a qualified biologist, shall be submitted to <br /> the Planning Division and the U. S . Soil Conservation <br /> Service for approval. The details of temporary <br /> revegetation shall be shown on the Excavation Plan. <br /> Evidence of the Soil Conservation Service ' s approval <br /> shall be submitted to the Planning Division. <br /> M. Maximum slopes for excavation and reclamation areas, as <br /> developed by a soils engineer or certified engineering <br /> geologist, shall be included in the Excavation Plan and <br /> submitted to the Planning Division for approval . <br /> n. Minimum setbacks for excavation near the bluff areas , as <br /> developed by a soils engineer or certified engineering <br /> geologist, shall be included in the Excavation Plan and <br /> submitted to the Planning Division for approval . <br /> o. The Excavation Plan shall indicate that surface soils <br /> and subsoils shall be separated during excavation of each <br /> strip and be replaced in the sane relative position <br /> during ongoing rehabilitation. A soil segregation and <br /> recoiling plan shall be submitted to the Planning <br /> Division, the U. S. Soil Conservation Service, and the <br /> California Division of Mines and Geology for approval . <br /> Evidence of approval by the Soil Conservation Service and <br /> the Division of Mines and Geology shall be submitted to <br /> the Planning Division. <br /> P. An Erosion Control Plan shall be included in the <br /> Excavation Plan and be approved by the Department of <br /> Public Works and the State Reclamation Board. Evidence <br /> of approval by the Department of Public Works and the <br /> State Reclamation Board shall be submitted to the <br /> Planning Division. <br /> -39- <br />