My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013248
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
88 (STATE ROUTE 88)
>
17749
>
2600 - Land Use Program
>
QX-90-1
>
SU0013248
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 9:24:21 AM
Creation date
5/8/2020 10:56:46 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013248
PE
2600
FACILITY_NAME
QX-90-1
STREET_NUMBER
17749
Direction
E
STREET_NAME
STATE ROUTE 88
City
CLEMENTS
Zip
95227-
APN
01922024
ENTERED_DATE
5/6/2020 12:00:00 AM
SITE_LOCATION
17749 E HWY 88
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
406
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PC: 9-6-90 <br /> QX-90-1 <br /> q. Demolition of the old bridge site and construction at the <br /> new site shall be performed to prevent siltation of the <br /> river. Construction shall take place during dry weather <br /> and low streamflow. Construction details shall be <br /> included in the Erosion Control Plan. <br /> r. The retention/percolation basin shall be designed to <br /> provide sufficient water storage capacity to allow <br /> percolation of surface water to the aquifer in the area <br /> of the proposed quarry excavation. Calculations for <br /> sizing the retention basin shall be approved by the <br /> Department of Public Works prior to inclusion in the <br /> Excavation Plan. The Excavation Plan shall include <br /> detailed grading measures to provide drainage to the <br /> retention basin and to prevent ponding of water on the <br /> remainder of the site. Grading shall be performed to <br /> prevent direct runoff to the Mokelumne River . <br /> S . The Excavation Plan shall establish an adequate setback <br /> from the drainage pond to prevent inundation of the <br /> gravel extraction area in the event of rainfall grater <br /> than the ten-year storm. The setback shall be developed <br /> by a soils engineer or certified engineer geologist to <br /> ensure that it is adequate to prevent pond slope failure <br /> due to quarry excavation. <br /> t. If the applicant determines that waterway markers (e. g. , <br /> signs or buoys) are necessary to warn or advise boaters <br /> of hazards during bridge construction, the markers must <br /> be placed or installed in accordance with the <br /> requirements as specified in Title 14 , Article 6 , <br /> California Code of Regulations. Marker details shall be <br /> approved by the State Department of Boating and <br /> Waterways, and evidence of that approval shall be <br /> submitted to the Planning Division. All required signs <br /> shall be in place before and during construction of the <br /> bridge. <br /> U. The Reclamation Plan for the north side of the Mokelumne <br /> River shall include grading and drainage details that <br /> will conduct surface runoff towards the large stock pond <br /> in the southwest corner of the site. Grading and <br /> drainage facilities shall be designed and constructed to <br /> maintain current runoff 'levels to the wetland area. <br /> V. The route of the access road and bridge through the <br /> riparian corridor shall be adjusted to avoid removal and <br /> -40- <br />
The URL can be used to link to this page
Your browser does not support the video tag.