My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012 - 2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
L
>
LOUISE
>
85
>
2300 - Underground Storage Tank Program
>
PR0231656
>
COMPLIANCE INFO_2012 - 2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 4:03:34 PM
Creation date
5/8/2020 11:48:14 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012 - 2015
RECORD_ID
PR0231656
PE
2351
FACILITY_ID
FA0003635
FACILITY_NAME
ARCO 06080
STREET_NUMBER
85
Direction
E
STREET_NAME
LOUISE
STREET_TYPE
AVE
City
LATHROP
Zip
95330
APN
19627010
CURRENT_STATUS
01
SITE_LOCATION
85 E LOUISE AVE
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
KBlackwell
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
408
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Facility Name: Arco #6080 (Page 3) <br /> In-Tank Gauging: <br /> ❑Check this box if tank gauging is used only for inventory control and disregard following section. <br /> Complete the fol owing checklist: <br /> ®Yes ❑ No* Has all input wiring been inspected for proper entry and termination, including testing for ground <br /> faults? <br /> ®Yes ❑ No* Were all tank-gauging probes visually inspected for damage and residue buildup? <br /> ®Yes ❑ No* Was accuracy of system product level readings tested? <br /> ®Yes ❑ No* Was accuracy of system water level readings tested? <br /> ®Yes ❑ No* Were all probes reinstalled properly? <br /> ®Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> G. Line Leak Detectors (LLD): <br /> ❑ Check this box if LLDs are not installed and disregard the followin2 section. <br /> ®Yes ❑ No* For equipment start-up or annual equipment certification, was a leak simulated to verify LLD <br /> ❑ N/A performance? (Check all that apply) Simulated leak rate: ® 3 gph.; ❑ 0.1 gph ; ❑ 0.2 <br /> h. <br /> ®Yes ❑ No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> ®Yes ❑ No* Was the testing apparatus properly calibrated? <br /> El Yes ❑ No* For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br /> ® N/A <br /> ®Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br /> ❑ N/A <br /> ®Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A is disabled or disconnected? <br /> ®Yes ❑ No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system <br /> ❑ N/A malfunctions or fails a test? <br /> ®Yes ❑ No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ❑ N/A <br /> ®Yes ❑ No* Were all items on the equipment manufacturer's maintenance checklist completed? <br /> * In the Section H, below, describe how and when these deficiencies were or will be corrected. <br /> H. Comments: <br />
The URL can be used to link to this page
Your browser does not support the video tag.