Laserfiche WebLink
hour, every 30 minutes for the next three hours, and hourly for the <br /> remainder of the pumping period. <br /> 4. After each test pumping period, a recovery period equal to the pumping <br /> duration shall be allowed before proceeding to the next pumping period. <br /> During recovery periods, water level measurements shall be made with f <br /> the same frequency as those taken during the pumping procedure antil <br /> sufficient data has been collected to extrapolate the full recovery of the <br /> well or until the Engineer requires no further data. <br /> 5. At the full completion of the test pumping and recovery periods, the '- <br /> gravel pack level shall be measured and, if necessary, the gravel <br /> envelope shall be refilled. <br /> 6. The Contractor shall provide, at his expense, any and all means of <br /> measuring water levels, pumping rates, recovery rates and the gravel <br /> level that allows the Engineer to keep continuously informed on they �{c! <br /> progress of development. [[ <br /> 7. The sand production shall average less than 5 parts per million when <br /> measured at one-minute intervals between 12 and 15 minutes after <br /> beginning of pumping at the design capacity of 2,500 gallons per minute. S J <br /> Sand production shall be measured by a centrifugal sand separator <br /> similar to that described in the Journal of the American Waterworks <br /> Association, Vol. 46, No. 2, February 1954. For purposes of the sand <br /> guarantee, sand production shall be defined as the average <br /> concentration measured at the well's capacity over a 3-minute period <br /> with readings taken at 12, 13, 14 and 15 minutes after pumping has <br /> started. <br /> 8. Turbidity shall be measured in NTU as described in Section 214A of , <br /> Standard Methods for the Examination of Water and Wastewater, 18t' <br /> edition 1992. Turbidity analyses shall be arranged for and paid for by <br /> the City. <br /> 9. Records: The Contractor shall keep accurate records of the pump test <br /> and furnish copies of all records to the Engineer upon completion of the <br /> testing. The records shall also be available to the Engineer for <br /> inspection at any time during the test. C. <br /> 10. The records shall include physical data describing the construction <br /> F � ,features such as (but not limited to): <br /> s a. Well depth and diameter. <br /> b. Complete screen description, length and setting. <br /> c. Description of the measuring point. <br /> d. Methods used in measuring water levels. <br /> e. Methods used in measuring pumping rates. <br /> 11. The retards shall also include the following g test data: <br /> a. Clock time and elapsed pumping time of each measurement. �. <br /> b. Depth to water below the measuring point. <br /> C. Pumping rate at the time of measurement. <br /> f d. Other pertinent comments or conditions that may affect the 1_N <br /> measurements. <br /> r�t <br /> Division III-30 <br />