Laserfiche WebLink
LW <br /> them in an approved manner. The Contractor shall demolish the entire building, <br /> including foundation pad and concrete to a depth of at least 3 feet. <br /> The well pump discharge lines shall be removed to a point no less than 3 feet below the <br /> existing grade. The end of the exposed water distribution line shall be sealed with a <br /> blind flange or cap welded in place. The existing valve for the discharge line shall be <br /> i. secured (i.e. welded) in the off position. <br /> The existing water pipes proposed to be removed shall be removed completely and <br /> L. excess material shall be disposed of off-site in a safe and legal manner, as specified in <br /> these specifications. The Contractor shall backfill and compact the trench as required <br /> immediately after completing removal of the existing drain pipes to the subgrade level to <br /> minimize hazardous conditions. Any water pipe that is abandoned in place shall have the <br /> ends plugged with concrete at least 1-foot thick. <br /> The Contractor shall furnish, place, and compact both the aggregate base material and <br /> asphalt concrete in the foot prints of the two existing pump houses once they are <br /> demolished, as described elsewhere in these special provisions. <br /> The Contractor shall protect from damage during construction all existing improvements <br /> and facilities that are not required to be removed during construction. Any existing <br /> improvements or facilities damaged during construction activities shall be replaced by the <br /> Contractor at no cost to the City. <br /> Demolition of the Lewis_Manor_Well_Pump House_ (Bid Item No. 6) <br /> v <br /> The masonry block building including sandpit, piping, slabs, concrete equipment <br /> supports, valve/meter boxes, bollards, electrical facilities, chain link fence and all other <br /> �. physical features within the project site shall be demolished. The pump (stored onsite), <br /> engine (natural gas fired), engine exhaust system, sand separator, well casing pipe <br /> (stored onsite), piping, valves and ancillary equipment including electrical facilities and <br /> L• radio antenna shall become property of the Contractor. The sand pit structure shall be <br /> demolished and the concrete walls removed down to a depth of at least 3 feet below <br /> ground surface. The hole shall be filled in with imported soil to match the surrounding <br /> +.. grade in conformance with Section 6, "Earthwork", of these special provisions. The <br /> Contractor shall remove said equipment and all materials encountered during the <br /> demolition process and dispose of them in an approved manner. <br /> La <br /> Demolition of the Corporation Yard Well Pump House: (Bid Item No. 7) <br /> L" The corrugated metal building, piping, paving and electrical facilities shall be <br /> demolished. The pump, motor, sampling pump, valves and ancillary equipment <br /> including electrical facilities, metal building and electrical service pole shall become <br /> La property of the Contractor. The Contractor shall remove and dispose of said equipment <br /> and all materials developed during the demolition process and dispose of them in an <br /> approved manner. <br /> La <br /> The pump station concrete floor slab shall be demolished and disposed of in an <br /> approved manner. <br /> 1.. <br /> Division IlI -36 <br />