My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
902
>
2900 - Site Mitigation Program
>
PR0516350
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 12:33:52 PM
Creation date
5/8/2020 12:01:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516350
PE
2950
FACILITY_ID
FA0012574
FACILITY_NAME
LEWIS MANOR - MUNI MW (4)
STREET_NUMBER
902
Direction
W
STREET_NAME
12TH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23229069
CURRENT_STATUS
02
SITE_LOCATION
902 W 12TH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 6 - PROGRESS SCHEDULE AND ORDER OF WORK <br /> The Contractor shall submit to the Engineer a practicable progress schedule within ten <br /> (10) calendar days of the "Notice to Proceed", and within five (5) calendar days of the <br /> Engineer's written request at any other time. The schedule shall show the order in <br /> which the Contractor proposes to carry out the work, the dates on which he will start the <br /> several salient features of the work (including procurement of materials and equipment), <br /> and the contemplated dates for completing the said salient features. <br /> As provided in Section 6-01 of the Standard Specifications of the City of Tracy, <br /> "Progress and Acceptance of Work", the Contractor is advised that the Engineer may <br /> further direct by areas on the site, the order of installation of each major item of work so <br /> that succeeding major items of work may have timely and simultaneous access and that <br /> failure to comply with directions of the Engineer concerning the order of work may be <br /> cause for damages should work under the same be delayed. <br /> Full compensation for conforming to the requirements of this section, not otherwise <br /> provided for, shall be considered as included in the prices paid for the various contract <br /> items of work involved and no additional compensation will be allowed. <br /> SECTION 7 - PAY ITEMS <br /> 4" No separate payment will be made for incidentals or any items delineated on the plans <br /> or called for in the specifications to be supplied and installed which are not specifically <br /> listed as bid items but are required to complete the project. Full compensation for such <br /> �- items shall be considered as included in the prices paid for the various contract items of <br /> work involved and no additional compensation will be allowed. <br /> �- The quantities listed in the bid schedule do not govern final payment. Payment to the <br /> Contractor will be made only for the actual quantities of contract items constructed in <br /> ` accordance with the plans and specifications. If upon completion of the construction, <br /> +.. these actual quantities show either an increase or decrease from the quantities given in <br /> the bid schedule, the contract unit prices will prevail. <br /> r.. Payment will not be made for materials and wastes disposed of in a manner not called <br /> for under contract. This includes, but is not limited to, rejected material not unloaded <br /> from vehicles, material rejected after it has been placed and material placed outside of <br /> s., the plan lines. No payment will be made for materials delivered to the site but not <br /> incorporated in the work. No compensation will be allowed for disposing of rejected or <br /> excess material. <br /> Payment for lump sum items of work shall be made in accordance with Section 9-2 <br /> "Lump Sum Work" of the SSPWC. Contractor shall submit to the Engineer, at the Pre- <br /> construction Conference, a detailed schedule or breakdown of lump sum items to be <br /> used as a basis for determining progress payments on lump sum work. <br /> DIVISION II-3 Special Requirements <br />