My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
902
>
2900 - Site Mitigation Program
>
PR0516350
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 12:33:52 PM
Creation date
5/8/2020 12:01:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516350
PE
2950
FACILITY_ID
FA0012574
FACILITY_NAME
LEWIS MANOR - MUNI MW (4)
STREET_NUMBER
902
Direction
W
STREET_NAME
12TH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23229069
CURRENT_STATUS
02
SITE_LOCATION
902 W 12TH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> Litems of work involved and no additional compensation will be allowed. <br /> SECTION 15 - NO PARKING SIGNS <br /> L <br /> The Contractor shall furnish and install "No Parking" signs within the project site as <br /> necessary. These signs shall be placed at least 48 hours prior to the scheduled j <br /> Lconstruction work. These signs will bear the "No Parking" time limits, dates and name of <br /> the Contractor. For any violation of.these "No Parking" signs by the citizens, the <br /> Contractor will contact the City's Police Department for removal of vehicles in <br /> accordance with California Vehicle Code. Location and duration of no parking limits <br /> shall be approved by the Engineer. All "No Parking" signs shall be stamped/signed by <br /> Engineer before posting. " No Parking" signs shall be removed when no work is under <br /> L , construction and reposted before resumption of construction activities. <br /> Full compensation for conforming to the requirements of this section, not.',otherwise <br /> provided for, shall be considered as included in the prices paid for the various contract <br /> items of work involved and no additional compensation will be allowed.. <br /> SECTION 16 - DUST AND NOISE CONTROL <br /> At all times, including weekends and holidays, during construction and until final <br /> completion and acceptance of the work, the contractor shall comply with the City Dust <br /> Control Ordinance and prevent the formation of an airborne dust nuisance by watering <br /> as required by the Engineer, and to treat the site of the work in such a manner that it will <br /> confine dust particles to the immediate surface of the work. The Contractor shall <br /> perform such treatment immediately during construction hours and within two (2)hours <br /> after notification by the Engineer that the airborne nuisance exists. If the',•Contractor falls <br /> to remove the nuisance within the above time frame, the City may order that the <br /> treatment of the site be done by City personnel and equipment or by others. All <br /> expenses incurred in the performance of this treatment shall be charged ',to the <br /> Co6tractor. The cost shall be paid for by the Contractor separately or be deducted from <br /> L the periodic payments to the Contractor as such costs are incurred by the City. <br /> The Contractor shall make every reasonable effort to control noise generated as a result <br /> of this construction to the satisfaction of the Engineer. Use of air compressor, jack <br /> hammer and other vibrating and loud sound generating equipment shall be limited to <br /> between the hours of 7:30 a.m. and 4:30 p.m. unless otherwise authorized by the <br /> L� Engineer. <br /> All hauling trucks or other construction vehicles leaving the site shall be cleaned of mud or <br /> L dirt clinging to exterior body surfaces or wheel rims before traveling on City streets outside <br /> the work limits. All trucks coming to or leaving the site with materials or loose debris shall <br /> be loaded in a manner which will prevent dropping of materials or debris on City streets. <br /> L Spillage resulting from hauling operations along or across any public traveled way shah be <br /> removed immediately at the Contractor's expense. <br /> The Contractor's attention is directed to Section 7.09, "Project Site Maintenance".of the <br /> City of Tracy Standard Specifications for compliance with the City's dust''control <br /> lL L <br /> requirements. <br /> DIVISION 11-7 Special Requirements <br /> L i <br />
The URL can be used to link to this page
Your browser does not support the video tag.