My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
12TH
>
902
>
2900 - Site Mitigation Program
>
PR0516350
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/8/2020 12:33:52 PM
Creation date
5/8/2020 12:01:13 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0516350
PE
2950
FACILITY_ID
FA0012574
FACILITY_NAME
LEWIS MANOR - MUNI MW (4)
STREET_NUMBER
902
Direction
W
STREET_NAME
12TH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23229069
CURRENT_STATUS
02
SITE_LOCATION
902 W 12TH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
150
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> 1 <br /> Continuous water service within and adjacent to the project site is essential at all times. <br /> If water service is disrupted for more than four (4) hours, the Contractor shall provide an ;I <br /> alternate, temporary water service to those areas, all at no cost to the City. <br /> Any sewer line broken during construction shall be immediately repaired by the Contractor <br /> at his own cost. The Contractor shall provide temporary bypass of sewers and shall be <br /> responsible to maintain sewer service at all times throughout the duration of the project. ' <br /> The Contractor shall schedule and coordinate the necessary shutting down of the existing <br /> € water main and sewer main with the City of Tracy Utility Division, the shut down shall be <br /> held to a minimum and the Contractor shall have all materials required for the work at the <br /> job site prior to requesting the shut down of the existing water main and sewer main. <br /> Full compensation for conforming to the requirements of this section, not otherwise I <br /> provided for, shall be considered as included in the prices paid for the various contract I, <br /> items of work involved and no additional compensation will be allowed. <br /> a <br /> SECTION 20 - INSPECTION <br /> The work shall be done by the Contractor to the complete satisfaction of the Engineer, <br /> and in accordance with the requirements of the City. Inspection of the work will be <br /> performed by the City. <br /> The Engineer shall at all times have safe access to the work during its construction so <br /> that it can be ascertained that the stock and materials used and employed, and the <br /> workmanship, are in accordance with the requirements and intention of the Contract <br /> Documents. All work done and all materials furnished shall be subject to his inspection <br /> and approval. In the event the Contractor elects to work on a Saturday, Sunday or legal <br /> Holiday, the Contractor shall notify the Engineer in advance in order that the inspection <br /> can be scheduled a Saturday, Sunday or legal Holiday.-- <br /> The Contractor shall notify the Engineer at least two (2) working days prior to <br /> commencing work so that inspection can be arranged. If the Contractor's work is <br /> suspended or no work has been prosecuted for three (3) days, at least two (2) days <br /> notice shall be given to the Engineer prior to performing additional work. <br /> The inspection of the work shall not relieve the Contractor of any obligations to fulfill this <br /> Contract as prescribed. Defective work shall be made good and unsuitable materials <br /> may be rejected, not withstanding that such defective work and materials have been i <br /> previously overlooked by the Engineer and accepted or estimated for payment. <br /> The Contractor's attention is directed to Section 6.09 of the City of Tracy Standard, <br /> Specifications regarding the completion and acceptance of the work. <br /> Full compensation for conforming to the requirements of this section, not'otherwise <br /> provided for, shall be considered as included in the prices paid for the various contract <br /> items of work involved and no additional compensation will be allowed. <br /> i <br /> DIVISION I1-9 Special Requirements <br />
The URL can be used to link to this page
Your browser does not support the video tag.