i,. storm drain system with the approval of the Engineer. Should contaminated <br /> groundwater be encountered during the excavation, the Contractor shall notify the <br /> ' Engineer immediately, and no contaminated water shall be discharged into the City's <br /> storm drain system. <br /> The Contractor shall at all times have on the project site sufficient pumping equipment <br /> for immediate use, including standby pumps for use in case other pumps become <br /> inoperable. Dewatering operations must continue such that the groundwater is at least <br /> 1 foot below the level of the compaction effort at all times. No compaction of saturated <br /> materials will be allowed. <br /> Backfillinq_of Imported Material: Backfill material and installation shall conform to the <br /> requirements of the City's Standard Plan No. 501. In case unsuitable or unstable <br /> material is encountered during excavation, the Contractor shall immediately notify the <br /> Engineer. Unsuitable material, as determined by the Engineer, shall be removed to a <br /> maximum depth of three feet (3) under the proposed subgrade, and replaced with an <br /> approved subbase material compacted at its optimum moisture content to at least 90% <br /> relative compaction . <br /> Compaction: Observations and soil density tests shall be carried on during grading to <br /> assist the Contractor in obtaining the required degree of compaction and the proper <br /> moisture content. Where compaction is less than required, additional compactive effort <br /> shall be made with adjustment of the moisture content as necessary until the specified <br /> compaction is obtained, at Contractor's own expense, and to the satisfaction of the <br /> Engineer. Compaction of backfill materials by flooding, ponding or jetting will not be <br /> permitted. <br /> Grading: Except where otherwise stated or shown in the project specifications or plans, <br /> the Contractor shall restore the finish grade to the original contours and drainage <br /> patterns. The Engineer shall be notified at least 48 hours prior to any grading operation. <br /> w Removal and Disposal of any Unsuitable Material: The Contractor shall dispose of any <br /> unsuitable material encountered during excavation, without regard to classification, that <br /> would interfere with the proper construction of the required work. <br /> MEASUREMENT AND PAYMENT <br /> �. Full compensation for conforming to the requirements of this section, not otherwise <br /> provided for, including all the labor, materials, tools, equipment, incidentals, and for <br /> doing all the work involved in excavation, sheeting, shoring, bracing, dewatering, <br /> L.0 importing and placing backfill, compacting, grading, removal and disposal of any <br /> unsuitable material required for the installation of the new improvements, all as specified <br /> " in the Standard Specifications, these special provisions, and as directed by the <br /> �. Engineer, shall be considered as included in the prices paid for the various contract <br /> items of work involved and no additional compensation will be allowed. <br /> LW <br /> Division III-7 <br /> La <br />