Laserfiche WebLink
WZI <br /> INC <br /> ' 80 CLEANUP OF CONSTRUCTION <br /> Drilling contractor will avoid contamination of the project area Drilling contractor will <br /> not dump waste oil, rubbish, or other materials on the ground, sewers or storm drains <br /> ' Drilling contractor will remove from the site all equipment, unused materials, temporary <br /> facilities and other miscellaneous items resulting from or used in the operations <br /> ' Drilling contractor will replace or repair any facility damaged during sampling except <br /> previously unknown or undisclosed underground utilities which will be repaired or <br /> ' replaced as necessary by an appropriately selected organization Site cleanup will be <br /> completed to the satisfaction of the WZI Manager <br /> 1 <br /> 1 <br /> APPENDIX 111 <br /> ' 12270020 025 18 <br />