Laserfiche WebLink
4.0 SCHEDULE <br /> It is estimated that h proposed scope of work can be completed within 8 to 10 weeks following <br /> e at d att ep p p p 8 <br /> the approval of this work plan <br />' 5.0 REFERENCES <br /> Bartow, J Alan and Tor H Nilsen, 1990, "Review of the Great Valley Sequence, Eastern Diablo <br />' Range and Northern San Joaquin Valley, Central California," USGS Open File Report 90- <br /> 226 <br /> tBoyajian & Ross, Inc , 1998a, "Work Plan for Initial Subsurface Investigation for Petroleum <br /> Hydrocarbons, Site Nos 2 and 3 (Site Code 1282-124)," report prepared for Port of <br />' Stockton, June 30, 1998 <br /> , 1998b, "Initial Subsurface Investigation for Petroleum Hydrocarbons, Site <br /> Nos 2 and 3 (Site Code 1282-124)," report prepared for Port of Stockton, October 21, <br /> 1998 <br /> EMCON, 1998, `Fourth Quarter 1997 Groundwater Monitoring Report, Port of Stockton, report <br /> prepared for Stockton Terminals Technical Committee, March 27, 1998 <br />' North Coast, Francisco Bay, and Central Valley e ional Water Quality Control Boards 1990, <br /> t <br /> "Tri-Regional Board Staff Recommendations for Preliminary Investigation and Evaluation <br /> of Underground Tank Sites," August 10, 1990 <br />' Sierra-Pacific Groundwater Consultants, Inc , 1994, "Results of Soil Investigation at 2130 West <br /> Washington Street Facility, Stockton, Califorrua," report prepared for Unocal Corporation, <br /> Section Between Bonngs P-38 and P-46,May 11, 1994 <br /> 1 <br /> , 19982 "First Semi-Annual 1998 Monitoring Report and Request for Regulatory Closure, <br />' Former PureGro Molasses Feed Product Facility, 2130 West Washington Street, Stockton," <br /> April 17, 1998 <br /> 1 ' <br />' 3addmvMm 9 PHILIP P. Ross, R.G. <br /> 1 <br />