Laserfiche WebLink
GCT-08-1992 15:21 FROM MICHAEL PAOLI & ASSOC. TO 18232398 P.02 <br /> �- - eeC <br /> m <br /> �>k Sw• <br /> SPRECKELS SUGAR COMPANY,INC. <br /> 4256 HACIENDA DRIVE P.O.BOX 8025 - PLEASANTON,CA 94588.8625 - (510)463.3400 FAX(510)463-3714 <br /> July 31, 1992 <br /> California Regional Water Quality Control Board <br /> Central Valley Region <br /> 3443 Routier Road, Suite A <br /> Sacramento, California 95827-3098 <br /> Attention: Mr. Greg K.Vaughn, P.E. <br /> Senior Engineer <br /> Subject: - Sugarbeet Processing Facility - Manteca, California <br /> Dear Mr.Vaughn: <br /> As you recall, Arnold Daglia and I met with you and your staff at your offices in <br /> Sacramento on May 15, 1992 to discuss the May 4, 1992 letter sent to Spreckels <br /> Sugar from the Regional Board regarding the use of lime at our Manteca factory. An <br /> important consensus reached at the meeting was the need for site specific data in <br /> order to accurately assess the impact, if any, on the ground water at the factory. <br /> As a result of the meeting, the proposed ground water monitoring program for <br /> the site was reviewed by the Regional Board. Spreckels Sugar, in conjunction with <br /> our ground water consultant, has modified the proposed plan to address concerns <br /> raised by the Board during the plan review. some well locations have been changed . <br /> and the current well siting plan is identified on Figure 1, which is included as an <br /> attachment to this letter. The changes are summarized as follows: <br /> • A second monitoring well has been added to the lime pond area to expand <br /> coverage along the northern edge of the ponds. <br /> • One of the monitoring wells at the waste water pond area has been deleted. <br /> • The location of the background monitor well has been moved further east and <br /> slightly north due to the sale of the land on which the original background well <br /> was located. <br />