Laserfiche WebLink
Neenah Paper,Inc. is March 28,2007 <br /> Response to RWQCB Let Page 3 of 3 <br /> Alternatively, we would prefer the following language: <br /> "Any maintenance or minor repairs shall be completed by October 31 st. For <br /> any construction or major repairs a detailed plan including actions and <br /> timelines shall be submitted by October 31 st. The discharger shall submit <br /> an annual report describing the results of the inspection and repair measures <br /> proposed and/or implemented, including available photographs." <br /> Please consider these proposed language changes to the draft MRP. If you have any <br /> questions, please call me at (530) 244-9703. <br /> Sincerely, Z NAL 0, <br /> DAVID L. <br /> L KIRKn <br /> David L. Kirk q/3a/0 ,No. 6673 <br /> Senior Geologist, P.G. 6673 w>Tf <br /> cc: Mr.Jim Kluesener,Neenah Paper FR, Ripon, CA <br /> Ms. Margaret Lagorio, San Joaquin County Environmental Health Division, Stockton, CA <br /> Mr. Matt Machado, City of Ripon Public Works Department, Ripon, CA <br /> 003044.00 Lawrence&Associates <br /> W.•I Clienal FoxRivM Proposed changes to Revised Monitoring and Reporting Program doc <br />