Laserfiche WebLink
-40 <br /> -45 ♦MW-1 <br /> ■MW-2 <br /> -50 <br /> ■ ++ ■ ■ <br /> 7 — X M W-3 <br /> 0 -55 x X ♦ MEX �■ X M W-4 <br /> > 1 X ♦ �(C <br /> E -60 r ♦ X X ♦MW-5 <br /> a •M W-6 <br /> _-65 <br /> w X X X +MW-7 <br /> -70 X <br /> • a -MW-8 <br /> -75 Y —MW-9 <br /> Alt ♦MW- <br /> -80 1 10 <br /> 0 20 40 60 80 100 120 140 <br /> Chloride(mg/L) <br /> Figure 14: 62H vs. Chloride <br /> Based on the above,the First Quarter,2015 Groundwater Monitoring Report recommended that the <br /> existing MW-5 be abandoned and destroyed and a new 2-inch monitoring well be constructed in an <br /> offset position,with at least a 10 foot annular seal and a minimum of 20 feet of well screen into the <br /> existing groundwater.This well has exceeded water quality goals in 34 out of 71 tested quarters with <br /> respect to total coliform. The well is also consistently the highest in iron and manganese <br /> concentrations. A review of the well log shows that a 6.5 foot well seal was placed in the upper 8 foot <br /> sand layer with the well screen beginning at a 7.5 foot depth. Under current California well standards, <br /> a minimum 10 foot well seal should be provided except under unusual circumstances. <br /> This workplan requests approval of the proposed destruction of MW-5 and the construction of a <br /> replacement well,MW-5R,to be located approximately 50 feet west of the existing well to be <br /> destroyed. The replacement well is intended to provide for representative sampling of groundwater <br /> and prevent any surface or near-surface contaminants from entering the well. The intent of this new <br /> well is to validate water quality indicated by MW-5 or confirm groundwater quality generally <br /> consistent with other compliance wells at the site.The location of the new well provides close spatial <br /> continuity with previous sampling.The well will be located between the perimeter access road and <br /> fence,and near the toe of the Pond 6 embankment. <br /> July 2015 Contonned with 21 October 2015 Conditional Approval 6 MW-5 Replacement <br /> City of Riverbark WWfF Monitoring Well Installation Workplan <br />