My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SACRAMENTO
>
711
>
3500 - Local Oversight Program
>
PR0545669
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/19/2020 11:37:23 AM
Creation date
5/19/2020 11:34:32 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0545669
PE
3528
FACILITY_ID
FA0005640
FACILITY_NAME
SJ SULPHER CO
STREET_NUMBER
711
Direction
N
STREET_NAME
SACRAMENTO
STREET_TYPE
ST
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
711 N SACRAMENTO ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
t <br /> r <br /> s <br /> BRUCE BURLINGTON <br /> PAGE 2 <br /> You may proceed with the site assessment phase by implementing the <br /> proposed scope of work, modified as noted above. Please submit an <br /> amended site map showing the modified boring locations and a completed <br /> drilling permit application with the associated $89.00 fee to PHS-EHD. <br /> After the permit for the drilling has been issued by this office, please <br /> provide PHS-EHD, at the number indicated below, with at least 48 hours <br /> advance notice prior to initiating the work at the site. <br /> If you have any questions or wish to discuss this letter in more detail, please <br /> contact Linda Turkatte, Senior REHS, at (209) 468-3441. <br /> Donna Heran, REHS, Director <br /> Environmental Health Division <br /> Linda A. Turkatte, Senior REHS Margardf Lagorio, RE S <br /> Site Mitigation Unit Lead Senior <br /> LT <br /> c: CVRWQCB, Beth Thayer <br /> c: SWRCB Cleanup Fund, Annabel Mackey <br /> c: Foothill Engineering, Iry Rifenburg <br /> G <br />
The URL can be used to link to this page
Your browser does not support the video tag.