Laserfiche WebLink
Commercial and Industrial Park <br /> Nearly 500 acres are available south of the central east-west McCloy Road/rail corridor <br /> for a three-phase development of a commercial and industrial park, from west to east. <br /> This phasing of development is independent of the maritime terminal phased <br /> development. <br /> Phase A <br /> This phase comprises 140 acres. The site contains five warehouse buildings that would <br /> be upgraded as an interim development by replacing the exterior cladding and roofs. <br /> Existing pipe utilities should be adequate to serve general occupancies such as light <br /> manufacturing and warehousing. The balance of this site will likely develop as office- <br /> industrial, and may be leased to a private developer for master development. In the event <br /> that the Immigrations and Naturalization Service facilities are developed to the <br /> immediate west,Phase A will serve as a buffer to adjacent campus developments to the <br /> east. <br /> Beyond development of the existing buildings,new structures and denser populations <br /> will require expansion of potable water service to the three phases. This will include <br /> installation of a minimum 12-inch diameter water line to Phase A, and potential <br /> installation of pump stations. Fire fighting water will be pumped from the river. Sanitary <br /> sewer, storm drainage,telecommunications,power, and gas facilities would be dependent <br /> of the nature and density of development and tenant needs. Infrastructure improvements <br /> associated with this and other phases are discussed below. <br /> In addition to the existing 600,000 square feet of buildings that may be rehabilitated,this <br /> phase is expected to include construction of tilt-up structures with offices in front, and <br /> high-bay light industrial functions in the larger rear area. Loading bays would likely be <br /> provided in the rear of the buildings. This type of development lends itself to a rectilinear <br /> grid of streets on"superblocks,"with truck alleys separating the rears of the buildings. <br /> Tenants would probably use maritime,road, and rail services. <br /> Phase B <br /> This 243-acre phase would likely be developed as campus office buildings,typically <br /> three to five stories in height. As much as 2 million square feet of buildings and a <br /> daytime population of 20,000 could be supported. Structured parking is necessary to <br /> support this dense development. If a single-use tenant is not found, conventional staged <br /> development can occur,probably using curvilinear streets,berming, and heavy planting <br /> to enhance the site. <br /> Phase C <br /> This phase is not necessarily time-constrained by Phases A and B, and could be an <br /> expansion of a Phase-B-type development, or a single-use tenant campus. The buildings <br /> on the site,including 50-year-old housing,the damaged Officer's Club,the NCO Club, <br />