My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS_XR0010336 (2)
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SHAW
>
1500
>
3500 - Local Oversight Program
>
PR0545688
>
ARCHIVED REPORTS_XR0010336 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/21/2020 11:23:19 AM
Creation date
5/21/2020 10:29:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0010336
RECORD_ID
PR0545688
PE
3528
FACILITY_ID
FA0003634
FACILITY_NAME
CANTEEN CORPORATION
STREET_NUMBER
1500
Direction
N
STREET_NAME
SHAW
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14326008
CURRENT_STATUS
02
SITE_LOCATION
1500 N SHAW RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
LSauers
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
250
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• network), the plans for upgrade (with supporting data) will be discussed with the client and the <br /> SJVPCD Additional details on the system evaluation process are provided in Section VTI <br /> Operation, Monitoring, and Performance (OMP) Plan <br /> Recovered Water <br /> A licensed waste transporter will transport recovered fluids from the moisture separator (5-201)to <br /> a licensed recycling/disposal facility on an as-needed basis To keep operating costs low, these <br /> fluids will be disposed in conjunction with the development/purge water from the groundwater <br /> monitoring events <br /> H. CONTINGENCY PLAN <br /> During startup of the remedial system, monitoring will be performed daily for three (3) days and <br /> biweekly (every two weeks) thereafter, to confirm treatment effectiveness and maintain the proper <br /> operation of the system The system will be optimized during this monitoring period to ensure it is <br /> operating within design and effluent/emissions parameters If any portion of the system is found to <br /> be ineffective following optimization, the client will be promptly notified The system will be shut <br /> down if necessary Available field data and other factors will be examined and evaluated by the <br /> • engineer to consider modifications Any proposed modifications to the remediation system will be <br /> submitted to the client and SJV personnel for approval prior to implementation of any modifications <br /> I. IMPLEMENTATION SCHEDULE <br /> Implementation of the system will progress in three stages pre-installation, installation, and start-up <br /> activities Pre-installation will involve well installation and obtaining the appropriate construction <br /> permitting Installation will include equipment procurement, shipment, installation, piping, and <br /> electrical connections (with pre-startup testing) Startup will include actual system startup and <br /> equipment optimization for up to 5 days All aspects of the HASP will be followed during each <br /> stage of the installation Before system start-up, the a System Review Checklist(SRC) checklist will <br /> be completed and implemented A copy of the SRC will be included in the OMP manual <br /> The procurement of the equipment will be initiated upon State approval of this RAP and is expected <br /> to take 5 to 6 weeks The installation of the treatment system will commence within 3 to 4 weeks <br /> prior to the expected receipt of the equipment The time required for the construction portion of the <br /> system installation is estimated to be 3 to 4 weeks The total time required, from client approval to <br /> system start-up, is anticipated to take approximately 12 to 14 weeks <br /> V-S <br />
The URL can be used to link to this page
Your browser does not support the video tag.