Laserfiche WebLink
Item No . 5 <br /> PC : 7-2-87 <br /> VR-86-5/UP-86-6 <br /> Page 14 <br /> corner of that project . The well site is located within one- <br /> quarter of a mile of the Christian Life Center site. <br /> In the event that the project is approved without the require- <br /> ment of connection to the City of Stockton water system, the <br /> County Department of Public Works recommends that the project <br /> be allowed to use a private water system on an interim basis, <br /> provided that the system is designed for future connection to <br /> the City of Stockton system when a connection becomes <br /> available. <br /> Storm Drainage : <br /> The applicant proposes to use a five-acre on-site percolation <br /> pond for storm drainage. A terminal storm drainage system is <br /> not available in the project area at this time . The Department <br /> of Public Works recommendation, in the event of application <br /> approval , is that the on-site drainage pond be allowed on an <br /> interim basis, provided the system is designed for terminal <br /> drainage when a terminal system has been created. <br /> Police and Fire Services: <br /> County police services are provided by the Shediff/Coroner. <br /> County fire protection service is provided by the Waterloo- <br /> Morada Fire District . <br /> Schools: <br /> The project site is located within the Lodi Unified School <br /> District . The payment of development fees to the school <br /> district would be required prior to the issuance of project <br /> building permits . <br /> Utilities: <br /> Gas and electricity are provided by the Pacific Gas & Electric <br /> Company. Pacific Bell provides local telephone service. <br /> ENVIRONMENTAL CONSIDERATIONS : <br /> If the Planning Commission denies the project as recommended by <br /> staff , the denial action will be considered exempt from the <br /> requirements of the California Environmental Quality Act . If the <br /> Commission intends , however, to either approve or conditionally <br /> approve the project , then an environmental determination is <br /> necessary. Either a Negative Declaration or an Environmental <br /> Impact Report would be required for this determination. <br />