Laserfiche WebLink
c-*" <br /> SUBJECT: PREAPPLICATION FOR ZONE RECLASSIFICATION OF H. & J. <br /> KEESEE, ET AL. <br /> --------------------------------------------------------------- <br /> I. Need for Site for C-1 Purposes: <br /> The proposed use of teh Keesee parcel by the prospective purchaser, <br /> Dr. and Mrs. Corwin Jones, if for his own dental office and other <br /> professional offices, some of which are proposed to be leased to <br /> his associates. Extensive research has been conducted and in this <br /> particular general area, which serves his present patients, we <br /> habe been unable to located any available sites which are properly <br /> zoned and would be appropriate for a Dental and Professional Office. <br /> II. Proposed Project: <br /> The proposed project would not create any new additional strip <br /> development along Hammer Lane but would only extend. a Re-Zoned <br /> Island which was approved previously at the Southwest corner of <br /> Hammer Lane and Pershing Avenue. <br /> III. Proposed Project Not Intrusion Into Residential Uses: <br /> The Hammer Lane Arterial corridor is now practically all• commercial <br /> frontage with the exception of this small last remaing area of <br /> residential use, except for those residential areas to the West <br /> which are separated from Hammer Lane by frontage roads and to the <br /> East of El Dorado Street which areas only have access through <br /> intersecting residential streets. The "Keesee Parcel" abutting <br /> on Hammer Lane (now zoned R-1 ) has no other access to any street <br /> except Hammer Lane and it is hard to imagine that any single family <br /> residence would be encouraged to be built there with the prospect <br /> of children playing near the heavy traffic flow of Hammer Lane. <br /> IV. Access Off Hammer Lane: <br /> Any neccessary access off Hammer Lane from the proposed professional <br /> office would not create any more of a problem than would the use <br /> of the parcel for a single family residence. The present plan for <br /> Hammer Lane, we understand, is for a center divider nedian in this <br /> area and the proposed development would call for ingress only by <br /> a right turn going East on Hammer Lane and egress by right turn <br /> only back onto the East flow of Hammer. <br /> V. Additional Considerations : <br /> A. In our discussions with the Stockton Traffic Engineer ' s <br /> Department we have been advised that present plans on Pershing <br /> call for widening of Pershing between Joan Avenue and Hammer Lane <br /> by an additional 15 feet on the East side of Pershing between Joan <br /> Avenue and Hammer Lane in order to create a badly needed right turn <br /> only land with restricted access for 200 feet South from Hammer Larre <br /> from the adjacent abutting properties . This would mean that two <br /> of the three present single family residences located between Joan <br /> Avenue and Hammer Lane would become land locked. <br />