My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2020
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CHEROKEE
>
35
>
2300 - Underground Storage Tank Program
>
PR0231320
>
COMPLIANCE INFO_2020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/8/2022 3:21:52 PM
Creation date
6/1/2020 11:43:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2020
RECORD_ID
PR0231320
PE
2361
FACILITY_ID
FA0003602
FACILITY_NAME
TESORO (SPEEDWAY) 68151
STREET_NUMBER
35
Direction
N
STREET_NAME
CHEROKEE
STREET_TYPE
LN
City
LODI
Zip
95240
APN
04318003
CURRENT_STATUS
01
SITE_LOCATION
35 N CHEROKEE LN
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
86
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TEST INSTRUCTIONS <br />POPPET & FLOAT MOVEMENT <br />FOR TESTABLE MODELS ONLY <br />TOOLS NEEDED FOR TESTING: <br />1. 114. square drive extension or 3/8' square drive ex- <br />tension with 3/8' to 1/40 socket adapter. <br />2. Torque wrench/1/4' or 3/8' square drive ratchet <br />wrench. <br />3. Pipe dope. <br />4. Flashlight(optiona8. <br />TEST STEP 1: <br />Remove spill container cover and fill cap from fill adapt- <br />er and look down Into the tube and make sure no debris <br />or foreign objects are present. If debris or foreign ob- <br />jects are present take appropriate steps before proceed- <br />ing. Look down Into the tube and ensure poppet is <br />completely protected by the deflection shield. See Test <br />Figure 1. If poppet Is exposed and tank Is not full the <br />overfill valve should be replaced. A flashlight may help <br />when Inspecting the tube. <br />TEST STEP 2: <br />Unthread the socket adaptor assembly from the Inlet <br />tube using a 1/4'square drive extension and wrench. <br />The extension will attach to the socket adaptor. Secure <br />all tools to ensure they don't fall Into the tank or valve. <br />With the extension still attached pull on the socket <br />adaptor and cable assembly and ensure float and pop- <br />pet move/ function properly. It should only require 3' <br />to 4- of movement and less than 5 lbs of force In order <br />to actuate the float and poppet. When looking down <br />Intothe upper tube ensure poppet Is visible and moves <br />into the flow path (see Test Figure 1 & 2) when socket <br />adaptor is pulled and resets properly when socket adap- <br />tor Is released. If poppet does not actuate freely take <br />appropriate steps to correct. <br />TEST STEP 3: <br />Apply pipe dope to the socket adaptor threads. Pipe <br />dope should be a non -hardening gasoline resistant pipe <br />thread seal compound. Make sure poppet and float <br />have reset properly and are not visible then Install sock- <br />et adaptor and torque to 3.5 fit -lbs (42 In -lbs) minimum <br />to 5.0 ft -lbs (601n-Ibs)maximum. Aker installing socket <br />adaptor, to ensure vapor tightness, DPW recommends <br />conducting pressure testing per CARB TP201.1 D. Some <br />areas may require pressure testing of overfill valve per <br />CARB TP201.1 D to ensure valve Is vapor tight. If the <br />drop tube falls pressure testing It may be necessary to <br />check the seal at the poppet adaptor threads. Reinstall <br />fill cap and spill container cover after testing. <br />QF9Bd <br />Flgure2g <br />INSP 6.If there Is no apparent damage or restrictions <br />reinstall the valve per the above Instructions and test <br />per local requirements. <br />7150 Performance Specifications <br />This Overfill Prevention Valve has been manufactured <br />and tested to, and met, the following California specifi- <br />cations. Performance Requirement. Leak rate to be less <br />than or equal to 0.17 CFHfa2.0' W.C. <br />Torque Specification <br />Taptite Screws, 010-24 thread cutting, 201n -lbs minl- <br />mum to 351n -lbs maximum. Tatable Models Only: <br />Socket Adaptor, 1/4' NPT, 3.5 ft -lbs (421n -lbs) minimum <br />to 5.0 ft -lbs (601n -lbs) maximum. <br />(IMPORTANT: Leave these installation Instructions <br />and maintenance procedures with the station opera- <br />tor. <br />Op <br />Pol <br />'III J -� I/IJ(♦�p,7 <br />Pull on extension and <br />TestF19ure2 <br />PREVENTIVE MAINTENANCE <br />Good Valve <br />Annually Inspect the flapper In the 71 SO to we that it is <br />Note: Figure 27 shows poppet location with float arm <br />open <br />open by looking down the drop tube opening (see In- <br />below). Testthe 7150 drop <br />`Dcflntion Shield <br />rud: Popper <br />procedure tube. <br />seals with CARB procedure TP -201.1 D. If the drop tube <br />pror«red <br />seal passes testing, no further maintenance is required. <br />INSP 4. Inspect the float by lifting upward. The float <br />If the drop tube fails testing, replace the drop tube seal <br />should move freely without any binding. See Figure <br />with DPW P/N: H11931 M for 4' Tubes. Re -test the 7150 <br />28. <br />drop tube with CARR procedure TP -201.1 D. The lower <br />tube o -ring seal DPW P/N: HI 4840M an al. be re- <br />placed. if this does not correct the leak the 7150 needs <br />to be replaced. <br />Bad Valve <br />FOR TESTABLE MODELS ONLY: The socket adaptor Defi—i- Shield <br />can be removed and poppet and float movement and -h Popper exposed <br />function Inspected without removing the valve. See <br />Page 17 for full testing details. If replacement parts are <br />needed for testable models the following Items are <br />available: DPW P/N 206741 Testable Inlet Tube 5/A. <br />206740 Socket Adaptor and Cable Assembly, and 61 SOK <br />-0001 Float Kit. <br />Figure <br />CAUTION: Do not insertany foreign object Into drop <br />27 <br />tube if flapper is in the dosed position. Farexam- <br />Note: Figure 27 shows poppet location with float arm <br />ple, a tank level measuring stick. This will damage <br />not activated. <br />the valve and void the Warranty. ALWAYS check <br />flapper location before"rticking' the tank. if flap- <br />INSP 4. Inspect the float by lifting upward. The float <br />per Is in the closed position, the tank is either over- <br />should move freely without any binding. See Figure <br />filled and you need to wait until the liquid level goes <br />28. <br />down or the 7150 Is damaged and needs to be re- <br />placed. <br />Inspection Procedure to Ensure Proper Operation <br />Note: For testable models valve does not need to be <br />removed from tank See page 17 for testable instruc- <br />_ <br />tions. <br />INSP 1. Remove the overfill valve from the tank as de- <br />scribed In step 26. <br />INSP 2. Visually Inspect the valve for damage. Make <br />sure no debris or foreign objects are In or on the valve. <br />INSP 3. With the float In the normal (do") position, <br />visually Inspect the valve to ensure the poppet Is not <br />Ffgure28 <br />exposed outside the deflection shield. See Figure 27. <br />INSP S. View down the tube to ensure the poppet Is <br />moving Into the flow, path when liking the float. See <br />Figura 29. <br />Appendix A <br />7150 Overfill Valve Upper Tube Calculation worksheet <br />Important: This Is meant to be supplemental worksheet and not a substitute to following the installation <br />manual Instructions. All length measurements are in inches. Please contact the Authority Having Jurisdic- <br />tion (AHA and review local, state, and national codes to determine the regulatory requirements governing <br />shut-off capacity In your region, as well as take into account other considerations such az extreme tank tilt. <br />Desired tank capacity for shut -ole: SO% - <br />Dipstick Number on Tank Chart that corresponds to 100% volume (Y) = 0 (y) <br />Dipstick Number on Tank Chart that corresponds to 50% (X) — 0 M <br />UpperTube Reference Number Z=Y-X 0 <br />UpperTube Depth Inside Tank C = Z-2' <br />Distance from top sealing surface for 7150 Lip' to inside the (C) <br />top of Storage Tank' A= <br />For Non -Testable 7150 models only <br />In all rases for non -testable 7150 models, the top of the valve body must protrude at least 6'h' Into the tank to <br />provide a minimal clearance for proper operation? Additionally the total Upper Tube Length must beat least 16' <br />of length to Include the protective bend In the tube. <br />Is C less than 6' h' Yes / No <br />If NO, Upper Tube Length (D)= C +A <br />If YES, UpperTube Length (D)=6'h'+A <br />Upper Tube Length = <br />For Testable 71 SO models only <br />In all cases for Testable 7150 models, the top of the valve body must protrude at least 6'h' Into the tank to provide <br />a minimal clearance for proper operation? Additionally the total UpperTube Length must beat least 14'h' of <br />length to Include the protective bend In the tube. <br />Is C less than 5' Yes / No <br />If NO, Upper Tube Length (D)= C+ A -1 %' <br />If YES, Upper Tube Length (D) = 6 %'+ A - 7 'n - <br />Upper Tube Length <br />' Sealingsutface maybe the top ofthe Fa Sea/Adapror, the builtin sealing ledge Inside— spillwma/nemoronnon- <br />vapor tghtapp/kafknslhe top ofthepipe nipple <br />' Some Undesground5foragefenks ut/l/xa menwaysysfemef fhe top hrakesureW—rheWpofthesforagefankfor <br />measuremenrandnorwropoffheman y ConsuhJrourundergroundrankmanufactumforbeghtofthemanway <br />M1,; measurement8 taken from theseam where the uppertube /samachedto Me vahebodyro the Inside ofthe tank fop <br />m' <br />
The URL can be used to link to this page
Your browser does not support the video tag.