My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0003240
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
N
>
99 (STATE ROUTE 99)
>
25650
>
2600 - Land Use Program
>
SA-91-06
>
SU0003240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 1:58:49 PM
Creation date
6/2/2020 2:13:11 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0003240
PE
2633
FACILITY_NAME
SA-91-06
STREET_NUMBER
25650
Direction
N
STREET_NAME
STATE ROUTE 99
ENTERED_DATE
11/6/2001 12:00:00 AM
SITE_LOCATION
25650 N HWY 99
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REVISED CONDITIONS OF APPROVAL <br /> SA-91-6 <br /> PAGE FOUR <br /> 1) Emissions generated during the construction process are <br /> of concern to the District. The following dust control <br /> practices shall be implemented: <br /> a) All material excavated or graded should be <br /> sufficiently watered to prevent excessive amount of <br /> dust. Watering should occur at least twice a day <br /> with complete coverage, preferably in the late <br /> morning and after work is done for the day. <br /> b) All clearing, grading, earth moving or excavation <br /> activities shall cease during periods of high winds <br /> greater than 20 mph averaged over one hour. <br /> C) All material transported off-site shall be either <br /> sufficiently watered or securely covered to prevent <br /> excessive amount of dust. <br /> d) The area disturbed by clearing, earth moving or <br /> excavation activities shall be minimized at all <br /> times. <br /> e) The developer shall mow instead of disking for weed <br /> control, thereby leaving the ground undisturbed and <br /> with a mulch covering. <br /> 2) After clearing, grading, earth moving, or excavation <br /> operations, fugitive dust emissions during the <br /> construction phase should be controlled by the following <br /> methods: <br /> a) All inactive portions of the construction site shall , <br /> be seeded and watered until grass growth is evident. <br /> b) All active portions of the site shall be <br /> sufficiently watered to prevent excessive amounts <br /> of dust. <br /> 3) At all times, fugitive dust emissions shall be controlled <br /> using the following procedures: <br /> a) On-site vehicle speed shall be limited to 15 mph. <br /> b) All areas with vehicle traffic shall be watered <br /> periodically for stabilization of dust emissions. <br />
The URL can be used to link to this page
Your browser does not support the video tag.