Laserfiche WebLink
Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring' <br /> 4.4.2-3 An inadequate wastewater sludge 4.4.2-3(a) The applicant should investigate potential beneficial uses for Review at SP stage. SJCDPW and SP <br /> treatment and disposal .system the wastewater treatment sludge and thoroughly evaluate the SJCCDD <br /> could adversely impact water feasibility of implementing one or more of these options in <br /> resources and public health due to the Specific Plan. <br /> release of untreated wastewater <br /> solids to local surface waters. <br /> 4.4.2-3(b) If disposal of wastewater treatment sludge at the Vasco Ceps of ONOGUt SJCCDD SP and PC <br /> Road landfill were one of the options identified during the GoAtr-aGl pFior to cn <br /> evaluation, a{�eval. Review at <br /> this alternative should be SP stage. <br /> included and discussed in the Specific Plan. The <br /> feasibility and necessary permit requirements should <br /> be discussed in detail. <br /> 4.4.2-3(c) Sludge drying beds should be designed and constructed to Review of design and SJCEIID and PC and C <br /> meet the requirements in Title 26, Division 23, Chapter 3, construction. SJCBD <br /> Subchapter 15 of the California Code of Regulations. <br /> 4.4.2-3(d) A pretreatment program designed to regulate non-domestic Review at SP stage. SJCCDD SP <br /> wastewater discharges into the sanitary sewer should be <br /> considered in developing the Specific Plan. <br /> 4.4.2-4 An uncontrolled release of 4.4.2-4(a) A preliminary Hazardous Materials Business Plan should be Review at SP stage. SJCCDD and SP <br /> hazardous materials would be developed to address material stored, used, and generated by SJCDPW <br /> possible with wastewater treatment the proposed wastewater treatment plant. This Plan should <br /> practices and could impact water be included as part of the project's Specific Plan. <br /> resources and public health. <br /> 4.4.24(b) Prior to design of the wastewater treatment plant. chemicals Review at SP stage. SJCDPW and SP <br /> for wastewater treatment operations should be carefully SJCCDD <br /> selected to minimize the potential for risk of upset. The <br /> selected chemicals should be identified in the Specific Plan. <br /> "llie chemical handling and storage facilities in the <br /> wastewater treatment plant should be designed to provide <br /> secondary containment and safety features to minimize and <br /> effectively mitigate accidental releases. <br /> ',SJCCDD:San.loaquin County Conununity Development Department: SJCBD:San.loaquin County Building Division;SJCDPW San Joaquin County Departhncnt of Public Works;USACE: U.S.Army Corps <br /> of Engineers; SJCFCE: San Joaquin County Flood Control Engineer; CSD: Community Services District(of project); RWQCB: Regional Water Quality Control Board; CDFG: California Department of fish <br /> and Game;SJCFI1D:San.loaquin County Environmental 11calth Department;DHS:California Department of Health Services;IAF-CO:Local Agency Formalion Commission. lbose responsible would maintain <br /> monitoring records and verify compliance with mitigation measure. <br /> GPA: General Plan Amendment stage; SP: specific Plan stage: PC: Pre-construction stage: (includes Tentative Map approval of and Final Map approvals and other discretionary application <br /> approvals' Construction stage (prior to building permit issuance): O: Operational stage. <br />