Laserfiche WebLink
7.1 MITIGATION MONITORING PROGRAM <br /> Public Utilities <br /> Table 7.1 - continued <br /> Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring" <br /> ■ PUBLIC UTILITIES/Storm Drainage <br /> 4.4.3-1 The storm water discharges into 4.4.3-1(a) The project applicant must submit an NPDFS permit Supply copy of SJCCDD; PC <br /> Mountain house Creek and Old application for storm water discharge associated with an NPDES permit. SJCDPW; <br /> River could contain pollutants that industrial activity to the RWQCB, Central Valley Region, at and SJCBD <br /> may adversely impact the least 30 days prior to the commencement of construction and <br /> beneficial uses of Old River. comply with all requirements specified in the NPDi S permit. <br /> "Ilmis submittal should be addressed in the Specific Plan. <br /> 4.4.3-1(b) The storm water collection system should be designed and Review at SP stage. SJCDPW: SP <br /> constructed to prevent erosion and minimize pollutant SJCCDD: and <br /> loading. "Ilmis system should be described in the Specific SJCBD <br /> Plan. <br /> 4.4.3-1(c) The Community Services District for the proposed project Review at SP stage. SJCDPW SP and PC <br /> should prepare and implement a Best Management Plan to: <br /> 1) prevent non-storm water from entering the storm water <br /> collection system: 2) minimize the discharge of pollutants <br /> into the storm water collection system, and, 3) prepare for <br /> prompt and effective response to accidental spills into the <br /> storm drain system. 11mis plan should be developed as part <br /> of theproject's Specific Plan. <br /> 4.4.3-1(d) An emergency response plan should be prepared for the Review of plan. OES and PC <br /> project to provide immediate and effective containment and SJCI'IID <br /> cleanup response to accidental spills and illegal dumping of <br /> materials into the storm drain system. The emergency <br /> response plan should be approved by the San Joaquin <br /> County Office of" Emergency Services prior to project <br /> construction. <br /> 4.4.3-2 The modifications proposed for 4.4.3-2(a) The applicant must apply for and comply with a Streambed Copy of approved CDFG: PC <br /> Mountain Fiouse Creek could Alteration Agreement from the California Department of Strcambbd Alteration SJCBD; and <br /> damage the existing riparian Fish and Game (CDI�G). Agreement. Super- SJCCDD <br /> habitat or prevent the vision of compliance <br /> establishment of a healthy riparian by CDFG and SJCBD. <br /> habitat. <br /> 4.4.3-2(h) Streamhed nmodification and riparian vegetation proposals Review at SP stage. SJCCDD and SP <br /> should he prepared at the Specific Plan stage and should he CDFG <br /> subject to approval by the County and CDFG. <br />