My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0013380
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
P
>
PATTERSON PASS
>
0
>
2600 - Land Use Program
>
GP-89-11
>
SU0013380
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/2/2020 4:22:18 PM
Creation date
6/2/2020 4:07:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0013380
PE
2600
FACILITY_NAME
GP-89-11
STREET_NUMBER
0
STREET_NAME
PATTERSON PASS
STREET_TYPE
RD
City
TRACY
Zip
95376-
APN
20904003
ENTERED_DATE
5/29/2020 12:00:00 AM
SITE_LOCATION
PATTERSON PASS RD
P_LOCATION
99
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\gmartinez
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
373
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
7.1 MITIGATION MONITORING PROGRAM <br /> Public Utilities <br /> Table 7.1 - continued <br /> Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring" <br /> ■ PUBLIC UTILITIES/Storm Drainage <br /> 4.4.3-1 The storm water discharges into 4.4.3-1(a) The project applicant must submit an NPDFS permit Supply copy of SJCCDD; PC <br /> Mountain house Creek and Old application for storm water discharge associated with an NPDES permit. SJCDPW; <br /> River could contain pollutants that industrial activity to the RWQCB, Central Valley Region, at and SJCBD <br /> may adversely impact the least 30 days prior to the commencement of construction and <br /> beneficial uses of Old River. comply with all requirements specified in the NPDi S permit. <br /> "Ilmis submittal should be addressed in the Specific Plan. <br /> 4.4.3-1(b) The storm water collection system should be designed and Review at SP stage. SJCDPW: SP <br /> constructed to prevent erosion and minimize pollutant SJCCDD: and <br /> loading. "Ilmis system should be described in the Specific SJCBD <br /> Plan. <br /> 4.4.3-1(c) The Community Services District for the proposed project Review at SP stage. SJCDPW SP and PC <br /> should prepare and implement a Best Management Plan to: <br /> 1) prevent non-storm water from entering the storm water <br /> collection system: 2) minimize the discharge of pollutants <br /> into the storm water collection system, and, 3) prepare for <br /> prompt and effective response to accidental spills into the <br /> storm drain system. 11mis plan should be developed as part <br /> of theproject's Specific Plan. <br /> 4.4.3-1(d) An emergency response plan should be prepared for the Review of plan. OES and PC <br /> project to provide immediate and effective containment and SJCI'IID <br /> cleanup response to accidental spills and illegal dumping of <br /> materials into the storm drain system. The emergency <br /> response plan should be approved by the San Joaquin <br /> County Office of" Emergency Services prior to project <br /> construction. <br /> 4.4.3-2 The modifications proposed for 4.4.3-2(a) The applicant must apply for and comply with a Streambed Copy of approved CDFG: PC <br /> Mountain Fiouse Creek could Alteration Agreement from the California Department of Strcambbd Alteration SJCBD; and <br /> damage the existing riparian Fish and Game (CDI�G). Agreement. Super- SJCCDD <br /> habitat or prevent the vision of compliance <br /> establishment of a healthy riparian by CDFG and SJCBD. <br /> habitat. <br /> 4.4.3-2(h) Streamhed nmodification and riparian vegetation proposals Review at SP stage. SJCCDD and SP <br /> should he prepared at the Specific Plan stage and should he CDFG <br /> subject to approval by the County and CDFG. <br />
The URL can be used to link to this page
Your browser does not support the video tag.