Laserfiche WebLink
Timing or <br /> Person/ Frequency <br /> Monitoring Agency of <br /> Impact Mitigation Measure Requirements Responsible' Monitoring' <br /> 4.4.3-3 The volume and rate of runoff 4.4.3-3(a) The operating budget of the Community Services District Budget statements to SJCDPW SP; O <br /> from the Mountain House New should be guaranteed to be sufficient for all maintenance be submitted to <br /> Town could cause excessive functions necessary to operate the storm water collection SJCDPW. Review at <br /> erosion and siltation of detention .system as intended. The budget should be addressed in the SP stage. <br /> ponds, creeks, drainage channels, Specific Plan. <br /> and Old River. <br /> 4.4.3-3(b) The performance standards and design features of the Review of pond design SJCBD; SP <br /> inlets to detention ponds should be included in the Specific and construction by SJCCDD and <br /> Plan. The design should allow for reduction In the SJCBD. SJCDPW <br /> velocity of the Incoming water. <br /> 4.4.3-3(c) If two-stage detention ponds were used, the inflow channel Review at SP stage. SJCBD and SP and PC <br /> for the upper stage (usually dry) should be constructed to SJCCDD <br /> prevent erosion, which may include a concrete low-flow <br /> channel or riprap, and should terminate at the edge of the <br /> lower stage (always wet). "lime design features and <br /> performance standards to prevent erosion should be <br /> provided in the Specific Plan. <br /> 4.4.3-3(d) Periodic removal of sediments from detention ponds should Review at SP stage. SJCDPW and SP and O <br /> occur to restore the capacities and to minimize resuspension SJCCDD <br /> of sediments. Pond maintenance objectives, activities, and <br /> approximate frequencies should be described in the <br /> Specific Plan; a detailed description of maintenance <br /> activities should be Incorporated Into an Operations <br /> and Maintenance Manual for the storm water collection <br /> system. <br /> 4.4.3-3(e) If grading or construction activities were to occur during the Review at SP stage. SJCBD and SP and O <br /> winter months. local drainage and temporary detention SJCCDD <br /> ponds should be provided to trap sediment in the runoff <br /> prior to discharge to creeks. ditches, or Old River. 'llmesc <br /> provision. Should be addressed in the Specific Plan. <br /> SJCCDD:San Joaquin County Community Development Department: SJ(-BD:San Joaquin County Building Division;SJCDPW San Joaquin County Department of Public Works;USACE: U.S.Army Corps <br /> of Engineers; SJCFCF: San Joaquin County Flood Control Engineer: CSD:Community Services District(of project); RWOCB: Regional Water Oualily Control Board;CDFG: California Department of Fish <br /> and Game;SJCEHD:San Joaquin County Environmental Health Department:DI IS:California Department of I lealth Services;L1FC'O:Local Agency Formation Commission. 'l-hose responsible would maintain <br /> monitoring records and verify compliance with mitigation measure. <br /> 2 GPA: General Plan Amendment Mage: SP: Specific Plan stage: PC: Pre-construction stage: (includes Tentative Map apprca,;oS+c and final Map approvals and other discretionary application <br /> approvals'. -- Construction stage (prior to building permit issuance): O: Operational stage. <br />