My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1 2003-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FITE
>
4704
>
2200 - Hazardous Waste Program
>
PR0522168
>
COMPLIANCE INFO_FILE 1 2003-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 6:24:55 PM
Creation date
6/3/2020 9:20:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1 2003-2007
RECORD_ID
PR0522168
PE
2226
FACILITY_ID
FA0014693
FACILITY_NAME
MARTIN-BROWER CO
STREET_NUMBER
4704
STREET_NAME
FITE
STREET_TYPE
CT
City
STOCKTON
Zip
95215
APN
18111013
CURRENT_STATUS
01
SITE_LOCATION
4704 FITE CT
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2226_PR0522168_4704 FITE_FILE 1 2003-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPCC PLAN 0 Stockton Center 21 <br /> All the tanks are associated with the truck maintenance facility at the south end of the <br /> property with the two diesel fuel tanks outside and the three oil tanks inside the facility. T <br /> used oil tank is pumped out every thirty days by Evergreen Environmental, Inc. <br /> 1.4 DRUM INVENTORY (112.7(a)(3)) <br /> The facility utilizes steel 55-gallon drum storage containers for petroleum-based chassis <br /> grease and gear lube. Two drums of each of these chemicals are stored inside the vehicle <br /> Maintenance Shop. <br /> 1.5 PAST SPILL EXPERIENCE (112.7(a)) <br /> This facility has experienced no oil spill since beginning operations in this facility that was <br /> newly constructed in October of 2002. Petroleum products have been present on the <br /> facility since 2003. <br /> 1.6 FACILITY DRAINAGE (112.8(b)) <br /> The topography of the site is generally flat. The site has been graded to direct surface <br /> runoff towards on-site drain catch basins. A network of concrete and asphalt swales and <br /> catch basins diverts storm water to the municipal storm sewer. Site grading prevents off- <br /> site storm water from running on site. The Site Plan in Exhibit B depicts site drainage <br /> structures and surface runoff patterns. <br /> The inside of the maintenance building is sloped towards the center of the service bay, <br /> where it drains into a trench before discharging into an oil/water separator. The effluent to <br /> the separator is connected to the municipal sanitary sewer system. <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.