My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 1 2003-2007
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FITE
>
4704
>
2200 - Hazardous Waste Program
>
PR0522168
>
COMPLIANCE INFO_FILE 1 2003-2007
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 6:24:55 PM
Creation date
6/3/2020 9:20:29 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 1 2003-2007
RECORD_ID
PR0522168
PE
2226
FACILITY_ID
FA0014693
FACILITY_NAME
MARTIN-BROWER CO
STREET_NUMBER
4704
STREET_NAME
FITE
STREET_TYPE
CT
City
STOCKTON
Zip
95215
APN
18111013
CURRENT_STATUS
01
SITE_LOCATION
4704 FITE CT
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\HW\HW_2226_PR0522168_4704 FITE_FILE 1 2003-2007.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
284
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPCC PLAN Stockton Center 21 <br /> 3.1 SUCTION AND PRESSURE LINE TESTING PROGRAM <br /> Martin-Brower tests all suction type lines every two (2) years. Running a precision line test <br /> performs this test. The pressure type lines are precision tested on a yearly basis. <br /> 3.2 TANK TESTING PROGRAM <br /> In accordance with 40 CFR 112.8(c)(6) tank integrity must be tested on a regular schedule. <br /> Matrix recommends this be done every five years since the Martin-Brower tanks are above <br /> ground and not in a corrosive environment. Testing must be visual and combined with <br /> another testing technique such as hydrostatic, radiographic, ultrasonic or acoustic <br /> emission testing. <br /> Also, regular testing of liquid level sensors is required. Matrix recommends the same five <br /> year schedule unless more frequent maintenance becomes necessary. This testing is <br /> require in accordance with 40 CFR 112.8(c)(8)(v). <br /> 3.3 FUEL PUMPING SYSTEM <br /> Delivery or Receiving Pumps <br /> The delivery and receiving pumps located at the facility are submersible pressure type <br /> pumps. The fuel islands are equipped with shear valves; breakaway disconnects on hoses, <br /> and emergency power shut-off switches. This equipment has been installed to prevent a <br /> release of product during an emergency situation. <br /> Pumping System Security and Emergency Shutdown <br /> All pumps are manually turned on at the beginning of a work shift and turned off at the end <br /> of the work shift. This is accomplished by turning on/off the breaker switch located inside <br /> the vehicle maintenance shop building. <br /> -10- <br />
The URL can be used to link to this page
Your browser does not support the video tag.