My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_FILE 2
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
F
>
FYFFE
>
305
>
2300 - Underground Storage Tank Program
>
PR0231821
>
COMPLIANCE INFO_FILE 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/9/2021 11:04:56 AM
Creation date
6/3/2020 9:42:39 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
FILE 2
RECORD_ID
PR0231821
PE
2332
FACILITY_ID
FA0004001
FACILITY_NAME
NAVAL COMMUNICATION STA*
STREET_NUMBER
305
Direction
W
STREET_NAME
FYFFE
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
16203007
CURRENT_STATUS
04
SITE_LOCATION
305 W FYFFE ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231821_305 W FYFFE_FILE 2.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
389
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br />REPRODUCED AT GOVERNMENT <br />PART 1 - GENERAL <br />SECTION 01401 <br />CONTRACTOR INSPECTION SYSTEM <br />1.1 APPLICABLE PUBLICATIONS: The publications listed below form a part of <br />this specification to the extent referenced. The publications are referred <br />to in the text by the basic designation only. <br />1.1.1 American Society for Testing and Materials (ASTM) Publications: <br />D 3666--83 Inspection and Testing Agencies for Bituminous <br />Paving Materials, Practice for <br />D 3740-80 Evaluation of Agencies Engaged in Testing and/or <br />Inspection of Soil and Rock as Used in Construction, <br />Practice for <br />E 329-77 (1983) Inspection and Testing Agencies for Concrete, Steel <br />and Bituminous Materials as Used in Construction, <br />Recommended Practice for <br />E 543-83 Nondestructive Testing Agencies, Rec. Practice for <br />Determining the Qualifications of <br />E 548-79 Testing and Inspection Agencies, Practice for <br />Generic Criteria for Use in Evaluation of <br />1.2 QUALITY CONTROL: Quality Control of this contract will be administered <br />under the General Provisions Clause entitled, "Inspection of Construction". <br />1.2.1 Contractor Inspection Plan: The Contractor shall furnish four copies <br />of the Contractor Inspection (CI) plan to the Contracting Officer within 15 <br />calendar days after receipt of the Notice of Award. The CI plan shall detail <br />the procedures, instructions, and reports to be used to assure compliance <br />with the contract. Unless specifically authorized by the Contracting Officer <br />in writing, no construction will be started until the CI plan is approved. <br />This plan will include, as a minimum: <br />r. quality • M. organization in cha.rt form, showing the <br />relationship of the quality controlorganization ti other elementsof <br />b. Names and qualifications of personnel in the quality control <br />organization. <br />c. Area of responsibility and authority of each individual in the quality <br />
The URL can be used to link to this page
Your browser does not support the video tag.