Laserfiche WebLink
• Containment procedures utilized. <br />• A description of the corrective actions implemented during the spill including the <br />disposal of the cleanup residues. <br />• A summary of the communications between Geofon had with Government officials <br />other than the COR. <br />4.23 SANITATION <br />A portable wash station will be located at the site for onsite personnel. The wash station <br />will be placed in the decontamination reduction zone for use during decontamination. A portable <br />toilet facility with sink will be provided at the site. - <br />Vehicles used for site work will be equipped with a first aid kit and safety equipment <br />including: <br />1. <br />Safety signs <br />2. <br />Wind sock or tell tail <br />3. <br />Soap and water <br />4. <br />Fluorescent vests <br />5. <br />Cones and barriers <br />6. <br />Barricades <br />7. <br />Fire extinguisher <br />8. <br />Flashlight <br />9. <br />Drinking water <br />10. <br />Portable eye wash <br />At least two individuals will be present onsite who are certified in first-aid/CPR-by the <br />American Red Cross or an equivalent agency. The local hospital will be notified prior to the <br />30 <br />