Laserfiche WebLink
4.26 SITE SECURITY <br />Site security and site control will be the responsibility of the Superintendent with <br />assistance from all personnel that may notice any non -routine activities or notice individuals on <br />the site that have not been identified as Geofon employees or subcontractors. <br />4.27 ENVIRONMENTAL PROTECTION PLAN <br />The purpose of this plan is to prevent environmental pollution and damage by the <br />presence of "chemical, physical, or biological elements or agents which adversely affect human <br />health or welfare; unfavorably alter ecological balances of importance to human life; affect other <br />species of importance to man; or degrade the utility of the environment for aesthetic, cultural <br />and/or historical purpose." Areas of consideration are air, water, and soil, including land <br />formations, biotic components of the remediation area, noise, solid waste and other pollutants. <br />The following measures will be taken to protect the environment: <br />Dust Abatement <br />The release of particulate matter may occur during excavation and operations. The <br />amount of particulate matter generated is anticipated to be minimal. Care will be taken to avoid <br />the generation of visible dust from work activities. Motorized equipment will be operated at <br />speeds that will not cause undue release of particulate matter. Water sprinkling of construction <br />zones, along haul routes, in equipment parking areas, and in waste areas will be implemented. <br />All disturbed excavation areas, upon completion of work, will be sprayed with water for dust <br />suppression at a rate sufficient to inhibit generation of airborne particulate matter. <br />Exhaust and Burning of Rubbish/Debris <br />Standard engineering devices will control all vehicular exhaust. Open burning of rubbish <br />and debris will not be done on the site. <br />33 <br />