Laserfiche WebLink
• <br />CONTRACTORS QUALITY CONTROL REPORT (OCR) SUBMIT DAILY To#OA REPRESENTATIVE <br />DAILY LOG OF CONSTRUCTION - MILITARY REPORT NUMBER <br />559 PAGE 2 <br />PROJECT DATE <br />TO -0007 Remove 2 UST's. Install 1 AST 13 Nov 2001 <br />D3.7C-Sharpe Site. CA COWRACTHWBER <br />DACW05-00-D-0008 <br />CONTRACTOR CERTIFICATION: On behalf of the contractor, 1 certify that this report is complete and correct and all equipment <br />and material used and work performed during this reporting period are in compliance with the <br />contract plans and specifications, to the best of my knowledge, except as noted above. <br />OC REPRESEN�TIIVE's�SIGNATURE DATE SUPERINTENDENT'S INITIALS <br />fD¢AATE% <br />