CONTRACTORS QUALITY CONTROL REPORT (QCR) SUBMIT DAILY TO THE OA REPRESENTATIVE <br />DAILY LOG OF CONSTRUCTION - MILITARY REPORT NUMBER <br />559 <br />PROJECT DATE <br />TO -0007 Remove 2 UST's. Install 1 AST 13 Nov 2001 <br />DDJC-Sharpe Site. CA CONTRACT NUMBER <br />DACWO5-00-D-0008 <br />CONTRACTOR (Or hired labor) 1. WEATHER <br />Geofon Inc_ <br />SUPERVISOR <br />2. OC NARRATIVE(S) <br />Subject: General Comments: <br />PAGE 1 <br />0 <br />No Interruption_ No Precipitation <br />Temperature Min 6OF Max 70F <br />Arrived on site at 0745_ Met with Brian Johnson and David Deww (V&W). Al <br />Gonzales(COR) and Craig Chafee (V&W). Garrett (Geo -Fon senior geologist) arrived <br />at 0830 hrs Badges allowing the crew on site were obtained. A safety briefing <br />was conducted at 0925 hrs. Dennis Catanyan (County representative) arrived at <br />0945 hrs. <br />The drill rig was set up at 0950 hrs. Garrett inspected the rig and observed <br />operations. Augering began at 1030 hrs. V&W began augering to concrete depth. <br />they then switched to air rotory drilling through the concrete. Once they <br />drilled through the concrete they switched to direct push with a split spoon <br />tip. The first sample was collected at 1115 hrs by Garrett Weiss. T-2 sample <br />was collected at 1232 hrs. <br />Rebar was encountered at the T-3 location. T-3 sample location was moved 1' <br />south after conferring with Dennis Catanyan. This sample was collected at <br />1450. V&W began grouting T-1. T-2 and T-3 sample holes with a slurry <br />cementuous mix. We left the site at 1600 hrs. <br />Subject: Safety Inspections/Meetings: <br />Topics included safety around drill machines. including hearing protection. <br />lifting techniques. complacency and hazards associated with drill rigs. We <br />also discussed safe driving speeds while on the base and basic base and company <br />rules. <br />7. CONTRACTORS ON SITE <br />The following Sub -Contractors started work today: <br />V&W Drilling <br />The following Sub -Contractors have left the site: <br />V&W Drilling <br />8. LABOR HOURS <br />The following Sub -Contractors had employees on site today: <br />Labor Number Of <br />Sub -Contractor Classification Employees <br />GEOFON INC. HEAVY -EQUIPMENT OPERATOR 0-0 <br />GEOFON INC. LABORER, EXCAVATION (TERM) 0-0 <br />GEOFON INC. SUPERV - EXCAVATING 1.0 <br />Total hours on job site this day......... <br />Total hours from start of construction <br />Hours <br />Worked <br />0.0 <br />0.0 <br />9.0 <br />9 <br />539.0 <br />