Laserfiche WebLink
CONTRACTORS QUALITY C TROL REPORT (OCR) SUBMIT DAILY TO THE PRESENTATIVE <br />DAILY LOG OF CONSTRUCTION - MILITARY REPORT NUMBER <br />408 <br />PROJECT DATE <br />T®-0007 Remove 2 UST's. Install 1 AST <br />DDJC-Sharpe Site. CA <br />CONTRACTOR (Or hired labor) <br />Geo -Fon Inc_ <br />SUPERVISOR <br />2. QC NARRATIVE(S) <br />15 Jun 2001 <br />CONTRACT NUMBER <br />DACW05-00-D-0008 <br />1. WEATHER <br />PAGE 1 <br />No Interruption. No Precipitation <br />Temperature Min 68F Max 95F <br />Subject: General Comments: <br />Geo -fon crew arrived at 0800 hrs_ Jose Jimenez and Mike Regli placed the <br />monitoring system in its place_ We will be leaving the site For approximately <br />2 weeks_ The samples will not be completed until then_ A modification for the <br />concrete boring will not be awarded before then. We will proceed when directed <br />to do so_ <br />8. LABOR HOURS <br />The following Sub -Contractors had employees on site today: <br />Labor <br />Sub -Contractor Classification <br />GEOFON INC. HEAVY -EQUIPMENT OPERATOR <br />GEOFON INC. LABORER, EXCAVATION (TERM) <br />GEOFON INC. SUPERV - EXCAVATING <br />Number Of <br />Employees <br />0.0 <br />2_0 <br />1.0 <br />Total hours on job site this day......... <br />Total hours from start of construction <br />Hours <br />Worked <br />0-0 <br />8-O <br />12.0 <br />530.0 <br />CONTRACTOR CERTIFICATION: On behalf of the contractor, I certify that this report is complete and correct and all equipment <br />and material used and work performed during this reporting period are in compliance with the <br />contract plans and specifications, to the best of my knowledge, except as noted above. <br />QC REPR_ E TATIVE's G ATURE DATE SUPERINTENDENT'S ITIALS DATE <br />G y� "'4/�� ��S/� <br />