CONTRACTORS QUALITY ONTROL REPORT (OCR) SUBMIT DAILY TO TO REPRESENTATIVE <br />DAILY LOG OF CONSTRUCTION - MILITARY REPORT NUMBER <br />404 PAGE 2 <br />PROJECT DATE <br />TO -0007 Remove 2 UST's. Install 1 AST 11 Jun 2001 <br />DDJC-Sharpe Site. CA CONTRACT NUMBER <br />DACW05-00-D-0008 <br />representatives left the site at 1200 hrs. Fred Martin and Don Valentine <br />returned to the site after lunch. 1300 hrs. and reviewed the days- events. They <br />left the site at 1330 hrs_ We began backfilling the UST with the pea gravel at <br />1300 hrs_ Backfilling was completed at 1545 hrs_ All sides of the excavation <br />were stable when we left. <br />Subject: Safety Inspections/Meetings: <br />A review of all UST removal procedures was conducted with Geofon employees and <br />subcontractors_ We will not stand underneath the UST. All persons will be <br />directed away from the operations area_ A tag line will be used to guide the <br />UST. The crane will set up away from the noticable trench location west of the <br />excavation. All personnel entering the work area will be dressed properly. <br />Equipment traffic control will be obeyed and observed_ No one will be allowed <br />to stand around the perimeter of the excavation_ All rigging devices will be <br />checked prior to using_ Crane will be inspected prior to using_ <br />3. ACTIVITIES STARTED OR FINISHED <br />The following activities were started today: <br />R00001-004 UST Removal <br />R00002-001 Provide Disposal of UST's <br />The following activities were finished today: <br />R00002-001 Provide Disposal of UST's <br />4. PREP/INITIAL INSPECTIONS <br />Initial Inspection was held today for BACKFILL & SITE RESTORATION. <br />Initial Inspection was held today for SAMPLING. <br />Initial Inspection was held today for UST REMOVAL. <br />8. LABOR HOURS <br />The following Sub -Contractors had employees on site today: <br />Total hours on job site this day......... <br />Total hours from start of construction <br />Hours <br />Worked <br />14-0 <br />28-0 <br />10-0 <br />52-0_ <br />478.0 <br />Labor <br />Number Of <br />Sub -Contractor <br />Classification <br />Employees <br />GEOFON INC. <br />HEAVY -EQUIPMENT OPERATOR <br />2.0 <br />GEOFON INC. <br />LABORER, EXCAVATION (TERM) <br />3-0 <br />GEOFON INC. <br />SUPERV - EXCAVATING <br />1-0 <br />Total hours on job site this day......... <br />Total hours from start of construction <br />Hours <br />Worked <br />14-0 <br />28-0 <br />10-0 <br />52-0_ <br />478.0 <br />