My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:10:33 AM
Creation date
6/3/2020 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTORS QUALITY ANTROL REPORT (OCR) SUBMIT DAILY TO To REPRESENTATIVE <br />DAILY LOG OF CONSTRUCTION - MILITARY REPORT NUMBER <br />397 <br />PROJECT DATE <br />TO -0007 Remove 2 UST's. Install 1 AST 04 Jun 2001 <br />DDJC-Sharpe Site. CA CONTRACT NUMBER <br />DACW05-00-D-0008 <br />CONTRACTOR (Or hired labor) 1. WEATHER <br />Geo, -Fon Inc_ <br />SUPERVISOR <br />PAGE 1 <br />No Interruption. No Precipitation <br />Temperature Min 6OF Max 85F <br />2. QC NARRATIVE(S) <br />Subject: General Comments: <br />Geo -fon crew arrived on site at 0700. Mark Swindel and Dave Valencia replaced <br />Jose Jimenez and Mike Rigli_ Vehicle and personal badges were renewed_ A <br />backhoe with a breaker attachment was picked up from Hertz. Demarcation of the <br />work area was reestablished. Concrete breakout began at 0930_ Two COR <br />representatives visited the site at approximately 1130 hrs. No comments were <br />exchanged. Holes were made in the concrete today. removal will begin <br />tomorrow. <br />Subject: Safety Inspections/Meetings: <br />All safety rules and procedures for concrete demolition were reviewed. Workers <br />were reminded to wear proper PPE (hard hats. safety glasses, safety boots. <br />safety vests. ear plugs. etc.)_ Slip trip and fall hazards were also <br />discussed_ <br />8. LABOR HOURS <br />The following Sub -Contractors had employees on site today: <br />Sub -Contractor <br />GEOFON INC. <br />GEOFON INC. <br />GEOFON INC. <br />9. EQUIPMENT HOURS <br />Labor <br />Classification <br />HEAVY -EQUIPMENT OPERATOR <br />LABORER, EXCAVATION (TERM) <br />SUPERV - EXCAVATING <br />U <br />Number Of Hours <br />Employees Worked <br />2-0 20-0 <br />1-0 10.0 <br />1-0 8-O <br />Total flours on job site this day......... 38-0 <br />Total hours from start of construction 290.0 <br />The following Equipment was used for the specified time: <br />Hours On Hours In <br />ID Equipment Description Shift Standby Operation <br />000005 Yellow Back hoe 1 0.0 10-0 <br />Total Hours 10.0 <br />CONTRACTOR CERTIFICATION: On behalf of the contractor, I certify that this report is complete and correct and all equipment <br />and material used and work performed during this reporting period are in compliance with the is <br />contract plans and specifications, to the best of my knowledge, except as noted above. <br />QC REPRESEIL.TATIVE's SIG ATURE DATE SUPERINTEND 'S INITIALS DATE <br />
The URL can be used to link to this page
Your browser does not support the video tag.