My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:10:33 AM
Creation date
6/3/2020 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br />TO -0007 Remove 2 UST's, Install AST Date: 04/28/2001 <br />DDJC-Sharpe Site, CA <br />DACWOS-00-D-0008 <br />AST RELOCATION <br />INITIAL PHASE CHECK LIST <br />NAME POSITION COMPANY <br />Don Valentine Base COE Representative. USACE - <br />Jose Jiminez Pipe fitter / laborer Geofon <br />Mike Rigley Laborer Geofon <br />Robert Castaneda Field Operations Manager Geofon Inc.. <br />f <br />-------------------------------------------------------------------------------------------------------------------------- <br />B. MATERIALS VERIFY: <br />The crane used was a 75 ton crane. All of the necessary documentation was given to <br />Don Valentine. Hertz sent over a low bed to transfer the AST. <br />-------------------------------------------------------------------------------------------------------------------------- <br />C. METHODS OR PROCEDURES OBSERVED: <br />The crane set up kitty corner to the AST and used a number of straps to hook onto <br />the AST. All of the straps were inspected prior to using. An expection of the <br />crane was conducted. The crane passed with flying colors. The AST was lifted onto <br />the low bed then transferred to the 330 location. The crane backed kitty corner to <br />the concrete pad and placed the AST into place without any incidence. <br />--------------------------------------------------------------------------------------------------.---------------- <br />D. WORKMANSHIP OBSERVED: <br />All work completed in a very professional manner. No accidents or incidences <br />occurred. Concrete did not crack, AST was placed very gently on the pad. The 7 <br />day break test results, 3480 psi. <br />E. SAFETY OBSERVED: <br />All safety rules were followed to the tee. Good job guys. <br />- -------- ----- ----- - ---- - ---- ------ ------------- ----- -- - -------- --- - - -- ----- - <br />QC REPRI - ATIVE SIGNAT <br />DATE <br />[UR-Mcai <br />PAGE 1 OF 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.