CONTRACTORS QUALITYAMNTROL REPORT (QCR) <br />SUBMIT DAILY TOT A REPRESENTATIVE <br />REPORT NUMBER <br />DAILY LOG OF CONS CTION - MILITARY <br />365 PAGE 1 <br />PROJECT <br />DATE <br />TO -0007 Remove 2 UST's, Install 1 AST <br />03 May 2001 <br />CONTRACT NUMBER <br />DDJC-Sharpe Site, CA <br />DACW05-00-D-0008 <br />CONTRACTOR (Or hired labor) <br />1. WEATHER <br />Geofon Inc. <br />No Interruption, No Precipitation <br />Temperature Min 65F Max 82F <br />SUPERVISOR <br />2. QC NARRATIVE(S) <br />Subject: General Comments: <br />Geofon crew arrived at 0800. The outside walls of the AST were washed and <br />rinsed. The existing monitors were disassembled and the power to the existing <br />monitors was transferred. All areas were cleaned and the fencing was moved to <br />enclose the entire AST area. The float was set in the fill bucket. All of the <br />piping was connected to the unistrut bars. I believe everything is completed <br />for the AST installation except the fuel transfer and testing. I asked Don if <br />he would look into this matter. We will be leaving the area after today.. <br />8. LABOR HOURS <br />The following Sub -Contractors had employees on site today: <br />Labor Number Of Hours <br />Sub -Contractor Classification Employees Worked <br />GEOFON INC. LABORER, EXCAVATION (TERM) 1.0 16.0 <br />GEOFON INC. PIPE FITTER 0.0 0.0 <br />GEOFON INC. SUPERV - EXCAVATING 1.0 8.0 <br />Total hours on job site this day......... 24.0 <br />Total hours from start of construction 252.0 <br />CONTRACTOR CERTIFICATION: On behalf of the contractor, I certify that this report is complete and correct and all equipment <br />and material used and work performed during this reporting period are in compliance with the <br />contract plans and specifications, to the best of my knowledge, except as noted above. <br />QC REPRESENTATI E's NAT ' <br />DATE <br />SUPERINTENDENT'S INITIALS <br />DATE <br />7 <br />