r] <br />CONTRACTORS QUALITYTROL REPORT (QCR) <br />SUBMIT DAILY TO T REPRESENTATIVE <br />DAILY LOG OF CONSTR CTION - MILITARY <br />REPORT NUMBER <br />364 PAGE 1 <br />PROJECT <br />DATE <br />TO -0007 Remove 2 UST's, Install 1 AST <br />02 May 2001 <br />CONTRACT NUMBER <br />DDJC-Sharpe Site, CA <br />DACW05-00-D-0008 <br />CONTRACTOR (Or hired labor) <br />1. WEATHER <br />Geofon Inc. <br />No Interruption, No Precipitation <br />Temperature Min 61F Max 8OF <br />SUPERVISOR <br />2. QC NARRATIVE(S) <br />Subject: General Comments: <br />Geofon is making final trimming of AST. Tie in connection to Day tanks will be <br />executed today. I called Don Valentine and reminded his of this event. He <br />stated that he would be arriving sometime in the a.m. I informed Chief Wyler <br />of this activity at 0830 hrs. He stated that he may be sending a <br />representative to inspect the work while it is being executed. Dan Beever <br />visited the site at 1045 hrs and stated that he informed the fire department <br />and requested an inspection. Inspectors Johnson.and Hutchins arrived at 1100 <br />hrs and noticed no problems. Continue on. The lines leading to the day tanks <br />were cut at approximately 1130 hrs. No problems incurred. Don Valentine <br />visited the job site and was pleased with the progress. I reminded Don that we <br />would need the fuel removed from the AST and additional fuel placed into the <br />AST from the UST before we can test the AST and its components. Don and I went <br />back to Don's office and attempted to -contact Mo Benson. He could not be <br />reached. I told Don that the day tanks had approximately 175 gallons. This <br />would be enough for an emergency situation. Worst case scenario, we would not <br />test the AST until we returned from Edwards AFB. Don didn't d <br />8. LABOR HOURS <br />The following Sub -Contractors had employees on site today: <br />Labor Number Of Hours <br />Sub -Contractor Classification Employees Worked <br />GEOFON INC. LABORER, EXCAVATION (TERM) 1.0 8.0 <br />GEOFON WC. PIPE FITTER 1.0 8.0 <br />GEOFON INC. SUPERV - EXCAVATING 1.0 8.0 <br />Total hours on job site this day......... 24.0 <br />Total hours from start of construction 228.0 <br />CONTRACTOR CERTIFICATION: On behalf of the contractor, I certify that this report is complete and correct and all equipment <br />and material used and work performed during this reporting period are in compliance with the <br />contract plans and specifications, to the best of my knowledge, except as noted above. <br />QC REPRES TATIVE' SIGN <br />DATE - <br />SUPE. DENT'S INITIALS <br />DAT <br />