My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2001-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
R
>
ROTH
>
850
>
2300 - Underground Storage Tank Program
>
PR0231898
>
COMPLIANCE INFO_2001-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/10/2020 2:10:33 AM
Creation date
6/3/2020 9:43:08 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2001-2005
RECORD_ID
PR0231898
PE
2332
FACILITY_ID
FA0003966
FACILITY_NAME
SHARPE SITE/DEF LOG AGENCY
STREET_NUMBER
850
Direction
E
STREET_NAME
ROTH
STREET_TYPE
RD
City
LATHROP
Zip
95330
APN
19802001
CURRENT_STATUS
02
SITE_LOCATION
850 E ROTH RD
P_LOCATION
07
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2332_PR0231898_850 E ROTH_2001-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
423
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTRACTORS QUALITY TROL REPORT (QCR) <br />SUBMIT DAILY jjflfiïż½ REPRESENTATIVE <br />REPORT NUMBER <br />DAILY LOG OF CONS CTION - MILITARY <br />363 PAGE 1 <br />PROJECT <br />DATE <br />TO -0007 Remove 2 UST's, Install 1 AST <br />01 May 2001 <br />CONTRACT NUMBER <br />DDJC-Sharpe Site, CA <br />DACW05-00-D-0008 <br />CONTRACTOR (Or hired labor) <br />1. WEATHER <br />Geofon Inc. <br />No Interruption, No Precipitation <br />Temperature Min 60F Max 83F <br />SUPERVISOR <br />2. QC NARRATIVE(S) <br />Subject: General Comments: <br />Geofon crew continued fuel and electrical line connections to the AST. No <br />problems to report. It seems that all pipe lines are falling into place. Don <br />Valentine and Dan Beever visited the site at different times. Both <br />representatives were reminded of the fact that we would be making the tranfer <br />of the fuel lines on Wednesday. Fuel from the AST will need to be removed <br />prior to firing the generators. The fuel from the ASTs will need to be <br />transferred from the UST as soon as they want to fire up to proceed. <br />Subject: Safety Inspections/Meetings: <br />A brief meeting was conducted. We discussed issues such as slips trips and <br />falls, lifting and complacency. <br />8. LABOR HOURS <br />The following Sub -Contractors had employees on site today: <br />Labor Number Of Hours <br />Sub -Contractor Classification Employees Worked <br />GEOFON INC. LABORER, EXCAVATION (TERM) 1.0 8.0 <br />GEOFON INC. PIPE FITTER 1.0 8.0 <br />GEOFON INC. SUPERV - EXCAVATING 1.0 8.0 <br />Total hours on job site this day......... 24.0 <br />Total hours from start of construction 204.0 <br />CONTRACTOR CERTIFICATION: On behalf of the contractor, I certify that this report is complete and correct and all equipment <br />and material used and work performed during this reporting period are in compliance with the <br />contract plans and specifications, to the best of my knowledge, except as noted above. <br />QC REPRESENTAg'1 1 UR <br />DATE <br />SUPERINTENDENT'S INITIALS <br />DATE <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.