Laserfiche WebLink
11 <br />CONTRACTORS QUALITYdbTROL REPORT (QCR) <br />REPRESENTATIVE <br />SUBMIT DAILY TO Tim <br />REPORT NUMBER <br />DAILY LOG OF CONST CTION - MILITARY <br />362 PAGE 2 <br />PROJECT <br />DATE <br />TO -0007 Remove 2 UST's, Install 1 AST <br />30 Apr 2001 <br />CONTRACT NUMBER <br />DDJC-Sharpe Site, CA <br />DACW05-00-D-0008 <br />8. LABOR HOURS <br />The following Sub -Contractors had employees on site today: <br />s <br />Labor Number Of Hours <br />Sub -Contractor Classification Employees Worked <br />GEOFON INC. LABORER, EXCAVATION (TERM) 1.0 8.0 <br />GEOFON INC. PIPE FITTER 1.0 8.0 <br />GEOFON INC. SUPERV - EXCAVATING 1.0 4.0 <br />Total hours on job site this day......... 20.0 <br />Total hours from start of construction 180.0 <br />9. EQUIPMENT HOURS <br />The following Equipment was used for the specified time: <br />Hours On Hours In <br />ID Equipment Description Shift Standby Operation <br />00004 Crane (Thompson & Rich Crane Service Inc 1 0.0 4.0 <br />Total Hours 4.0 <br />11. EQUIPMENT CHECKS <br />The following Equipment was safety inspected today: <br />Type of Equipment Model # Serial # Results <br />Crane {Thompson & Rich Crane HTC -8670 F218-9695 Passed <br />CONTRACTOR CERTIFICATION: On behalf of the contractor, I certify that this report is complete and correct and all equipment <br />and material used and work performed during this reporting period are in compliance with the <br />contract plans and specifications, to the best of my knowledge, except as noted above. <br />QCR ENTAT V TURE <br />DATE <br />SUPERINT T'S INITIALS <br />DATE <br />