Laserfiche WebLink
0-0007 Remove 2 UST's, Install AST Date: 04/19/2001 ' <br />DDJC-Sharpe Site, CA <br />DACW05-00-D-0008 <br />FORMWORK FOR AST PA® <br />INITIAL PHASE CHECK LIST <br />NAME POSITION COMPANY <br />Don Valentine COE Base Representative USACE <br />Robert Castaneda Field Operations Manager Geofon Inc. <br />B. MATERIALS VERIFY: <br />Lumber used was new lumber. Rebar used was also recently purchased. <br />-------------------------------------------------------------------------------------------------------------------------- <br />C. METHODS OR PROCEDURES OBSERVED: <br />Formwork has been placed in a very professional manner. All forms have been kicked <br />off properly. All seems to be in place for concrete placement tomorrow. <br />-------------------------------------------------------------------------------------------------------------------------- <br />D. WORKMANSHIP OBSERVED: <br />Workmanship can be classified as professional. All aspects of form placement <br />approved by QC representative. <br />----------------------------------------------------------------------------------------------------------------------- <br />E. SAFETY OBSERVED: <br />All safety rules observed. An electrical cord was replaced because of defect. <br />This was noticed by Don Valentine on a site visit. <br />--------------------------------------------------------------------------------------------------------------------------- <br />QC <br />(1)(6)(4) PAGE 1 OF 1 <br />DATE <br />--// <br />