Laserfiche WebLink
0007 Remove 2 UST's, Install T <br />DDJC-Sharpe Site, CA <br />DACW05-00-D-0008 <br />A. PERSONS IN ATTENDANTS: <br />NAME <br />Don Valentine <br />Robert Castaneda <br />B. ITEMS OF MUTUAL UNDERSTANDING: <br />POSITION <br />COE Representative <br />Field Operations Manager <br />USACE <br />USACE <br />Date: 04/23/2001 <br />COMPANY <br />. Concrete will be placed on a solid surface. . Two cylinders will be collected for <br />break testing (4 -day and 7 -day) <br />Concrete will be wetted down to reduce hydration. <br />Forms will be stripped within 24 hrs of concrete placement. <br />All safety rules will be adhered to. <br />Concrete will be placed within 1.3 hrs after concrete truck arrival. <br />There will be no construction joints in the pad. <br />Concrete finish will be a smooth finish. <br />-------------------------------------------------------------------------------------------------------------------------- <br />CERTIFICATION: I hereby certify that the items noted above constitute a memorandum of mutual understanding and will be <br />performed as planned and specified. <br />QC REPREE T,ATIVF/SIGN�TCI,RE i DATE <br />(1)(6)(4) PAGE 1 OF 1 <br />